Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Sidney A Murray Jr Hydroelectric | Blakely Mountain |
|---|---|---|
| 192 MW | 75 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| First National Bank-Commerce | USCE -Vickburg District | |
| 8 | 2 | |
| 885.2 GWh | 158.1 GWh | |
| 52.5% (2024) | 24.0% (2024) | |
| #72 of 1,349 | #198 of 1,349 | |
| 2024-12 | 2024-12 |