Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Saranac Facility | Lockport Energy Associates LP |
|---|---|---|
| Capacity | 285.6 MW | 221.3 MW |
| Technology | Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle |
| Operator | Saranac Power Partners LP | Lockport Energy Associates LP |
| Operating units | 3 | 4 |
| Latest 12-month generation | 354.9 GWh | 39.5 GWh |
| Latest complete-year capacity factor | 14.1% (2024) | 2.0% (2024) |
| National technology rank | #373 of 538 | #403 of 538 |
| Latest EIA report | 2024-12 | 2024-12 |