Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Kearny Generating Station Hudson County | Gilbert Hunterdon County |
|---|---|---|
| Capacity | 605 MW | 512 MW |
| Technology | Natural Gas Fired Combustion Turbine | Natural Gas Fired Combustion Turbine, Natural Gas Fired Combined Cycle |
| Operator | — | Gilbert Power, LLC |
| Operating units | 13 | 10 |
| Latest 12-month generation | 141.1 GWh | 54.7 GWh |
| Latest complete-year capacity factor | 2.7% (2024) | 1.2% (2024) |
| National technology rank | #20 of 825 | #338 of 538 |
| Latest EIA report | 2024-12 | 2024-12 |
Generation comes from EIA-923. Capacity, unit counts, technology, and reporting relationships come from EIA-860. Incomplete reporting years are excluded from capacity-factor comparisons.