Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Claytor | Laurel Dam |
|---|---|---|
| 74.8 MW | 70 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| Appalachian Power Co | USCE-Nashville District | |
| 4 | 1 | |
| 220.4 GWh | 53.2 GWh | |
| 33.6% (2024) | 8.7% (2024) | |
| #200 of 1,349 | #213 of 1,349 | |
| 2024-12 | 2024-12 |