Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Dresden Energy Facility | Carroll County Energy |
|---|---|---|
| 678.3 MW | 832.3 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| Appalachian Power Co | Carroll County Energy LLC | |
| 3 | 3 | |
| 3.68 TWh | 5.54 TWh | |
| 70.5% (2025) | 72.3% (2025) | |
| #193 of 538 | #133 of 538 | |
| 2026-06 | 2026-06 |