Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Tenaska Virginia Generating Station | Key |
|---|---|---|
| 1,011.4 MW | 830.6 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| Tenaska Virginia Partners LP | PSEG Keys Energy Center, LLC | |
| 4 | 3 | |
| 4.45 TWh | 4.37 TWh | |
| 58.0% (2025) | 60.1% (2025) | |
| #91 of 538 | #134 of 538 | |
| 2026-06 | 2026-06 |