Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Meldahl Hydroelectric Project | Roanoke Rapids |
|---|---|---|
| 105 MW | 100 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| City of Hamilton - (OH) | Virginia Electric & Power Co | |
| 3 | 4 | |
| 445.6 GWh | 271.7 GWh | |
| 48.3% (2024) | 30.9% (2024) | |
| #144 of 1,349 | #157 of 1,349 | |
| 2024-12 | 2024-12 |