Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Blackstone Wind Farm II LLC | Bright Stalk Wind Farm I |
|---|---|---|
| Capacity | 200 MW | 205.2 MW |
| Technology | Onshore Wind Turbine | Onshore Wind Turbine |
| Operator | Blackstone Wind Farm II LLC | Lexington Chenoa Wind Farm LLC |
| Operating units | 1 | 1 |
| Latest 12-month generation | 506.9 GWh | 752.7 GWh |
| Latest complete-year capacity factor | 28.9% (2024) | 40.4% (2025) |
| National technology rank | #276 of 1,362 | #227 of 1,362 |
| Latest EIA report | 2024-12 | 2026-04 |