Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Carroll County Energy | CPV Fairview Energy Center |
|---|---|---|
| 832.3 MW | 825 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| Carroll County Energy LLC | CPV Fairview, LLC | |
| 3 | 3 | |
| 5.54 TWh | 5.32 TWh | |
| 72.3% (2025) | 104.0% (2025) | |
| #133 of 538 | #61 of 538 | |
| 2026-06 | 2026-06 |