Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Braidwood Generation Station | TalenEnergy Susquehanna |
|---|---|---|
| 2,449.8 MW | 2,532 MW | |
| Nuclear | Nuclear | |
| Constellation Nuclear | TalenEnergy Susquehanna LLC | |
| 2 | 2 | |
| 19.57 TWh | 19.54 TWh | |
| 94.0% (2025) | 83.7% (2025) | |
| #9 of 54 | #8 of 54 | |
| 2026-06 | 2026-06 |