Google Midlothian Data Center Building
Operating · Google · TX
Google operates the Midlothian Data Center Building in Texas as part of a 540-acre, five-building campus; Google invested in its first Texas data center at this location in 2019. Buildings 1–4 are completed or inspection-complete, while Building 5 is under construction as of January 2026. The facility reports 85.15 MW utility-service capacity and 51.09 MW critical IT load.
Overview
- Status
- Operating
Operating Google Midlothian campus with five identified buildings/phases; Buildings 1–4 are documented as completed, closed, or inspection-complete, while Building 5 is registered and under construction as of July 27, 2026.
- Exact-site power
- 85.15 MW
Utility Service · Operating
- Campus size
- 1,288,600 sq ft
5 reported buildings · Parent campus
- Project cost
- $500.0M
Estimated construction cost in the cited project filing.