Google Red Oak Data Center Campus
Operating · Google · 330 North Austin Boulevard, Red Oak, TX
Google’s Red Oak data-center campus is in Ellis County, Texas, separate from its Midlothian location. Google announced the Red Oak investment in 2023 and now reports campus-specific operating efficiency: quarterly power usage effectiveness was 1.14 in the second quarter of 2026. A Texas accessibility filing identifies the RED1A data-center project at 330 North Austin Boulevard, with Corgan as its designer. RED1A’s filed area and estimated cost describe that construction project, not the entire campus. Google has not provided a whole-campus electrical-demand figure in these sources.
Overview
- Status
- Operating
Google lists Red Oak as a Texas data-center location and publishes its quarterly operating-efficiency results.
- Exact-site power
- Not disclosed
No exact-site MW figure in cited sources.
- Site
- Not disclosed
Campus · Floor area and acreage not disclosed
- Compute profile
- Hyperscale · Cloud