H5 Data Centers Ashburn
Operating · H5 Data Centers · 21800 Beaumeade Circle, Ashburn, VA
H5 Data Centers Ashburn is an operating carrier-neutral colocation facility at 21800 Beaumeade Circle in Ashburn. H5 describes the site as 255,000 square feet with up to 60 MVA of power and a Tier III design. The reported MVA figure remains a facility specification, not an inferred MW demand or a promise of available grid capacity. The profile maps the exact site to the PJM-serving utility territory and separates it from neighboring Ashburn campuses.
Overview
- Status
- Operating
Operating facility
- Exact-site power
- 42 MW
Utility Service · Reported
- Facility size
- 255,000 sq ft
Facility
- Project cost
- $360.0M
Estimated construction cost in the cited project filing.