Pisgah Ridge Solar, LLC
Duke Energy Renewables Services · Navarro County · ERCOT
Pisgah Ridge Solar is a 250 MW photovoltaic facility in Navarro County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 65631, with service beginning in December 2022 and Duke Energy Renewables Services as the registered operator. Duke Energy announced full operation in March 2023. Duke sold its utility-scale Commercial Renewables business to Brookfield in October 2023; the transaction announcement did not list Pisgah Ridge individually.
Overview
Key fields
- Operating capacity
- 250 MW
EIA May 2026
- Charles River VPPA
- 102 MW
15 years
- Meijer VPPA
- 83 MW
15 years
- Registry anchor
- Plant 65631
Duke Energy Renewables Services
Resource stack
- 2 resources
PISGAH_SOLAR1 · PISGAH_SOLAR2
Profile
- Grid role
- Utility-scale solar generation in ERCOT.
- Operating record
- 250 MW · Dec 2022 EIA service month · full-operation announcement in Mar 2023.
- Power purchasers
- Charles River 102 MW · Meijer 83 MW · third undisclosed company.
- Corporate transaction
- Duke sold its utility-scale renewables business to Brookfield in Oct 2023; the release did not name individual plants.
Structured profile
- Operating capacity
- 250 MW
EIA May 2026
- Registered operator
- Duke Energy Renewables Services
EIA
- EPC contractor
- Moss
Duke Energy
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| PSGAH | 250 MW 250 MW summer | Solar Photovoltaic Solar · PV | Dec 2022 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 250 MW
- National rank
- #76
- TX rank
- #33
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
ERCOT disclosed dispatch
2 ERCOT market resources · Solar
Generation
3 mo through May 22, 2026Capacity factor is average output vs. this plant's observed peak.
Output by hourlocal time · 90 days through May 22, 2026
Latest disclosed outputhourly · 2 weeks ending May 22, 2026
Generation from ERCOT's 60-Day SCED Disclosure (≈60-day lag), summed over this site's market resources.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Market registration
ERCOT public disclosuresOperating context
ERCOT market recordsInterconnection record
ERCOT GIS ReportMatched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Nearby substations
HIFLD infrastructure inventoryRelated parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Power purchaser under a 102 MW 15-year VPPA | Duke Energy Pisgah Ridge operation | |
| Power purchaser under an 83 MW 15-year VPPA | Duke Energy Pisgah Ridge operation | |
| Market resources | PISGAH_SOLAR1, PISGAH_SOLAR2 | Linked ERCOT resources. |
| Grid selection | plant:plant-65631 | Canonical asset page /ercot/assets/plant/pisgah-ridge-solar-llc. |
Reporting portfolio
| Largest reported plants | Capacity | State |
|---|---|---|
| Frontier Windpower II | 351.8 MW | OK |
| Pisgah Ridge Solar, LLCCurrent | 250 MW | TX |
| Mesquite Creek Wind | 211.2 MW | TX |
| Ledyard Windpower, LLC | 207 MW | IA |
| Mesteno | 201.6 MW | TX |
| Los Vientos Wind 1B | 201.6 MW | TX |
| Rambler | 200 MW | TX |
| Los Vientos Windpower IV | 200 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioTimeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- EIA Service MonthEIA May 202...
EIA reports December 2022.
- Latest disclosed generation interval
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Sun Valley Solar Project
Solar · 250 MW
Hill County
True North Solar, LLC
Solar · 238.8 MW
Falls County
Orion II Solar Project
Solar · 250 MW
Milam County
Copperhead Solar, LLC
Solar · 250 MW
McLennan County