Solar PhotovoltaicNYISO · Montgomery Countyplant:plant-65765

High River Energy Center, LLC

High River Energy Center, LLC - Montgomery County - NYISO

High River Energy Center is a 90 MW utility-scale solar photovoltaic facility in the Town of Florida, Montgomery County, New York, in NYISO Zone F. High River Energy Center, LLC, formed in August 2017, is an indirect wholly owned subsidiary of NextEra Energy Resources, LLC. The project consists of commercial-scale solar arrays using Jinko 415 W and Safe Harbor 370 W photovoltaic modules (322,010 total modules), 12,385 strings of DC-coupled arrays with both fixed-tilt and single-axis tracking systems, and 28 Power Electronics FS3350MVA inverters rated 3.465 MW each. The facility generates electricity at 34.5 kV internally, steps voltage to 115 kV at an on-site collection substation, and interconnects through a Point of Interconnection switchyard to National Grid's existing Stoner-Rotterdam #12 115 kV transmission line via a 500-foot 115 kV transmission line.

Overview

Key fields

Nameplate capacity
90 MW

Canonical EIA plant baseline.

Registry anchor
Plant 65765

plant-65765

Structured profile

Technology
Solar Photovoltaic
Operator
High River Energy Center, LLC

Units and generators

Operating generator records and technology attributes reported through EIA-860.

GeneratorCapacityTechnologyOperationStatus
HR0190 MW
90 MW summer
Solar Photovoltaic
Solar · PV
Aug 2024Operating

Performance

Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.

Peer context

Technology capacity
90 MW
Solar Photovoltaic
National rank
#525
of 7,234 operating peers
NY rank
#2
of 717 operating peers

Monthly generation

Download CSV
Latest 12 months
145.5 GWh
Reported net generation
Latest report
Apr 2026
EIA-923 monthly filing
2025 capacity factor
19.8%
Using current reported nameplate capacity
Aug 2024: 17.8 GWh2024-08Sep 2024: 18.8 GWhOct 2024: 16.7 GWhNov 2024: 10 GWhDec 2024: 4.5 GWhJan 2025: 7.2 GWhFeb 2025: 5.5 GWh2025-02Mar 2025: 15.2 GWhApr 2025: 16.3 GWhMay 2025: 15.8 GWhJun 2025: 19.4 GWhJul 2025: 22.2 GWhAug 2025: 22.1 GWh2025-08Sep 2025: 18.5 GWhOct 2025: 6.9 GWhNov 2025: 4.2 GWhDec 2025: 3.1 GWhJan 2026: 2.8 GWhFeb 2026: 5.2 GWh2026-02Mar 2026: 12.6 GWhApr 2026: 12.9 GWh2026-04

Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.

Grid and market context

Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.

Nearby substations

HIFLD infrastructure inventory
IN SERVICE · 115 kV
2.0 km
IN SERVICE · 69 kV
4.3 km
IN SERVICE · 115 kV
4.9 km
IN SERVICE · 115 kV
4.9 km
IN SERVICE · 115 kV
5.3 km

Commercial, land, and environmental record

Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.

Transactions and agreements

Company Formation
Aug 25, 2017
High River Energy Center, LLC was formed as a Delaware limited liability company to develop, own, operate, and maintain the solar project.
High River Energy Center, LLC
documents.dps.ny.gov
Contract Execution
2018
High River signed a long-term agreement with NYSERDA to sell renewable energy credits generated by the project.
High River Energy Center, LLC · New York State Energy Research and Development Authority
documents.dps.ny.gov
Regulatory Approval
Mar 11, 2021
The New York State Board on Electric Generation Siting and the Environment granted High River authority to construct and operate the approximately 90 MW facility in Montgomery County.
High River Energy Center, LLC · New York State Board on Electric Generation Siting and the Environment
documents.dps.ny.gov

Related parties and identifiers

Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.

Relationship graph

Drag organizations to explore the network. Select a node to pin its details and available page link.

AssetProject companyMarket / regulatorOrganizationOfftakerEquipment

Parties and identifiers

RelationshipEntityBasis
Project company / owner / operatorHigh River Energy Center, LLCProject owner, operator, and applicant
Parent company / financier / equity investorNextEra Energy Resources, LLCIndirect parent company and equity owner
Parent companyNextEra Energy, Inc.Ultimate parent company
Interconnection counterparty / balancing authority / market operatorNew York Independent System Operator, Inc.Market operator, balancing authority, and interconnection party
Interconnection counterparty / transmission owner / interconnecting utilityNiagara Mohawk Power Corporation d/b/a National GridConnecting Transmission Owner and interconnecting utility
OfftakerNew York State Energy Research and Development AuthorityRenewable energy credits offtaker
Equipment supplierJinko SolarSolar photovoltaic module supplier
Equipment supplierSafe HarborSolar photovoltaic module supplier (designation only)
Grid selectionplant:plant-65765Canonical asset page /nyiso/assets/plant/high-river-energy-center-llc.

Reporting portfolio

EIA reporting entity
High River Energy Center, LLC
Entity 65016
Operating portfolio
1 plants
1 states
Reported capacity
90 MW
Solar Photovoltaic

Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.

Timeline and sources

Project milestones and public references behind the asset profile.

Project timeline

  1. High River Energy Center, LLC formationdocuments.d...

    High River Energy Center, LLC was formed as a Delaware limited liability company to develop, own, operate, and maintain the solar project.

  2. NYSERDA renewable energy credits purchase agreementdocuments.d...

    High River signed a long-term agreement with NYSERDA to sell renewable energy credits generated by the project.

  3. Article 10 Certificate of Environmental Compatibility and Public Need…documents.d...

    The New York State Board on Electric Generation Siting and the Environment granted High River authority to construct and operate the approximately 90 MW facility in Montgomery County.

  4. Generator enters operationEIA-860

    EIA-860 lists generator HR01 with this operating date.

Common questions about High River Energy Center, LLC

Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.

How big is High River Energy Center, LLC?

High River Energy Center, LLC has a reported capacity of 90 MW. Source: EIA Form 860M.

What kind of plant is High River Energy Center, LLC?

High River Energy Center, LLC is a Solar Photovoltaic facility in Montgomery County, NY, participating in the NYISO market.

Where is High River Energy Center, LLC located?

High River Energy Center, LLC is in Montgomery County, NY, inside the NYISO balancing area.

Who operates High River Energy Center, LLC?

High River Energy Center, LLC is operated by High River Energy Center, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.

How much electricity does High River Energy Center, LLC generate?

High River Energy Center, LLC reported 145.5 GWh over the twelve months to 2026-04. Figures are net generation as filed to EIA-923.

How does High River Energy Center, LLC compare to other plants?

By capacity, High River Energy Center, LLC ranks #525 of 7,234 operating plants of the same technology nationally. It ranks #2 of 717 in NY.

Asset analyst
plant:plant-65765

Ask about High River Energy Center, LLC

Investigate technology, capacity, output, price behavior, ownership, and related facilities using this profile plus current grid data.