Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Thomas C Ferguson | Lost Pines 1 Power Project |
|---|---|---|
| 574.6 MW | 609 MW | |
| Natural Gas Fired Combined Cycle | Natural Gas Fired Combined Cycle | |
| Lower Colorado River Authority | Lower Colorado River Authority | |
| 4 | 3 | |
| 3.74 TWh | 2.83 TWh | |
| 72.1% (2025) | 48.7% (2025) | |
| #273 of 538 | #242 of 538 | |
| 2026-06 | 2026-06 |