Thomas C Ferguson is a natural gas-fired power facility with 574.6 MW of EIA-reported nameplate capacity in Llano County, Texas, registered as EIA Plant ID 4937. City of San Marcos Electric Utility is the current owner; Lower Colorado River Authority is the registered plant entity or operator. The Ferguson Replacement Project was the first power plant issued a greenhouse-gas permit by the U.S. Environmental Protection Agency under the federal rules cited by Fluor; LCRA describes the permit as the first in Texas under those rules.