Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Fence Post Solar Hybrid Project, LLC | Stampede Solar Hybrid |
|---|---|---|
| Capacity | 308 MW | 328.1 MW |
| Technology | Batteries, Solar Photovoltaic | Batteries, Solar Photovoltaic |
| Operator | Fence Post Solar Project, LLC | Stampede Solar Project LLC |
| Operating units | 2 | 2 |
| Latest 12-month generation | 509.9 GWh | 531.6 GWh |
| Latest complete-year capacity factor | 19.4% (2025) | 18.8% (2025) |
| National technology rank | #118 of 7,234 | #68 of 7,234 |
| Latest EIA report | 2026-06 | 2026-06 |