Stampede is Enel's solar-and-storage project in Ellis County. EIA's June 2026 inventory records 255.9 MW of solar nameplate plus a 72.2 MW / 115 MWh battery; Enel separately markets the project on DC bases as 326 MWdc solar and 86 MWdc storage.
Mapped infrastructure geometry associated with this asset.
EIA plant 67762 · Inventory for Aug 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| STMPB | Batteries | Operating | 72.2 | 115 |
| STMPS | Solar Photovoltaic | Operating | 255.9 | Unknown |
Mapped infrastructure geometry associated with this asset.
Similar plants ranked by technology, capacity, and distance.
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| STMPB | 72.2 MW 72.2 MW summer | Batteries Electricity used for energy storage · BA | Oct 2024 | Operating |
| STMPS | 255.9 MW 255.9 MW summer | Solar Photovoltaic Solar · PV | Nov 2025 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
3 ERCOT market resources · Battery / storage, Solar
Cycles/day is discharged energy vs. usable capacity (~129 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at STAM_SLR_ALL over 365 days (2025-10-12 to 2026-10-11).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Stampede Solar reports 72.2 MW battery storage + 255.9 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Aug 2026.
Stampede Solar is a Solar photovoltaic generation plus battery storage facility in Hopkins County, TX, participating in the ERCOT market.
Stampede Solar is in Hopkins County, TX, inside the ERCOT balancing area.
Stampede Solar is operated by Stampede Solar Project LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Stampede Solar reported 530 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Stampede Solar ranks #78 of 7,597 operating plants of the same technology nationally. It ranks #33 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.