Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | School Street | Hudson Falls Hydroelectric Project |
|---|---|---|
| Capacity | 38.8 MW | 44 MW |
| Technology | Conventional Hydroelectric | Conventional Hydroelectric |
| Operator | Erie Boulevard Hydropower LP | Boralex Hydro Operations Inc |
| Operating units | 5 | 2 |
| Latest 12-month generation | 158.8 GWh | 210.4 GWh |
| Latest complete-year capacity factor | 46.6% (2024) | 54.4% (2024) |
| National technology rank | #310 of 1,349 | #282 of 1,349 |
| Latest EIA report | 2024-12 | 2024-12 |