Hudson Falls is a 44 MW conventional run-of-river hydroelectric power plant on the Hudson River near South Glens Falls, New York. Commissioned in January 1995, the facility comprises two 22 MW generating units. It operates with a flow of 230 m³/s and 19.8 m head on a 1,087 km² watershed. The project generates approximately 206 GWh annually and avoids 51,287 tons of CO2 per year. The facility is licensed under FERC Project No. P-5276, with an active license valid through November 26, 2042.
Mapped infrastructure geometry associated with this asset.
EIA plant 54953 · Inventory for Oct 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GEN1 | Conventional Hydroelectric | Operating | 22 | Unknown |
| GEN2 | Conventional Hydroelectric | Operating | 22 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GEN1 | 22 MW 22 MW summer | Conventional Hydroelectric HY | Nov 1995 | Operating |
| GEN2 | 22 MW 22 MW summer | Conventional Hydroelectric HY | Nov 1995 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Where the plant sits in NYISO: its market, pricing node, utility territory and the network around it, each with how it is known.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
FERC issued Hudson Falls Project (P-5276) license. License expiration date is November 26, 2042.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
| Largest reported plants | Capacity | State | |
|---|---|---|---|
| Hudson Falls Hydroelectric ProjectCurrent | 44 MW | NY | |
| South Glens Falls Hydroelectric | 13.8 MW | NY | |
| New York State Dam Hydro | 11.4 MW | NY | |
| Sissonville Hydro | 3 MW | NY | |
| Warrensburg Hydroelectric | 2.9 MW | NY | |
| Middle Falls Hydro | 2.2 MW | NY |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioHudson Falls Hydroelectric Project commissioned and placed in commercial operation.
Hudson Falls placed in service according to EIA generating unit record.
Boralex Power Income Fund acquired Hudson Falls as one of two New York hydroelectric facilities from partnerships controlled by Black Hills Corporation for approximately US$177.3 million combined consideration. Transaction included US$70 million loan from Toronto-Dominion (Texas), Inc. to U.S. subsidiary and US$35 million loan from The Toronto-Dominion Bank to Canadian subsidiary.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Hudson Falls Hydroelectric Project reports 44 MW hydroelectric of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Oct 2026.
Hudson Falls Hydroelectric Project is a Conventional Hydroelectric facility in Saratoga County, NY, participating in the NYISO market.
Hudson Falls Hydroelectric Project is in Saratoga County, NY, inside the NYISO balancing area.
Hudson Falls Hydroelectric Project is operated by Boralex Hydro Operations Inc according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Hudson Falls Hydroelectric Project reported 170.4 GWh over the twelve months to 2025-12. Figures are net generation as filed to EIA-923.
By capacity, Hudson Falls Hydroelectric Project ranks #282 of 1,356 operating plants of the same technology nationally. It ranks #5 of 156 in NY.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.