Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Clinch River | Ceredo Generating Station |
|---|---|---|
| Capacity | 475 MW | 519 MW |
| Technology | Natural Gas Steam Turbine | Natural Gas Fired Combustion Turbine |
| Operator | Appalachian Power Co | Appalachian Power Co |
| Operating units | 3 | 6 |
| Latest 12-month generation | 312.7 GWh | 920.4 GWh |
| Latest complete-year capacity factor | 6.7% (2025) | 15.4% (2025) |
| National technology rank | #60 of 257 | #87 of 825 |
| Latest EIA report | 2026-04 | 2026-04 |