Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Meldahl Hydroelectric Project | Claytor |
|---|---|---|
| 105 MW | 74.8 MW | |
| Conventional Hydroelectric | Conventional Hydroelectric | |
| City of Hamilton - (OH) | Appalachian Power Co | |
| 3 | 4 | |
| 445.6 GWh | 220.4 GWh | |
| 48.3% (2024) | 33.6% (2024) | |
| #144 of 1,349 | #200 of 1,349 | |
| 2024-12 | 2024-12 |