Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Highlander Solar Energy Station 1 | Carvers Creek Solar |
|---|---|---|
| Capacity | 165 MW | 153.9 MW |
| Technology | Solar Photovoltaic | Solar Photovoltaic |
| Operator | AES Distributed Energy | Carvers Creek, LLC |
| Operating units | 1 | 2 |
| Latest 12-month generation | 287.2 GWh | 237.1 GWh |
| Latest complete-year capacity factor | 19.8% (2025) | 16.6% (2025) |
| National technology rank | #240 of 7,234 | #257 of 7,234 |
| Latest EIA report | 2026-04 | 2026-04 |