Registry, engineering, and operating metrics shown on a consistent EIA basis.
| Metric | Salina | Gavins Point |
|---|---|---|
| 259.2 MW | 132.3 MW | |
| Hydroelectric Pumped Storage | Conventional Hydroelectric | |
| Grand River Dam Authority | USACE-Omaha | |
| 6 | 3 | |
| 17.1 GWh | 712.6 GWh | |
| — | 61.3% (2024) | |
| #21 of 39 | #117 of 1,349 | |
| 2026-06 | 2024-12 |