Post Oak Wind LLC
Shackelford County · ERCOT
Post Oak Wind LLC is a wind power facility with 200 MW of EIA-reported operating capacity in Shackelford County, Texas, registered as EIA Plant ID 56483. Horizon Wind Energy LLC is the public owner or developer; Mesquite Wind LLC is the registered plant entity or operator. Commercial operation began in December 2007. The facility interconnects at Post Oak 2 substation (connects to ONCOR Long Creek Switching Station) at 138 kV.
Overview
Key fields
- Reported capacity
- 200 MW
EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- Technology
- Onshore Wind Turbine
Primary generation technology.
- Registry anchor
- Plant 56483
Mesquite Wind LLC · Shackelford County · ERCOT
- Operating status
- Operating
Post Oak Wind LLC is operating.
- Grid connection
- Post Oak 2 substation (connects to ONCOR Long Creek Switching Station)
138 kV · ONCOR
- Commercial operation
- December 2007
Best-supported operating milestone.
Profile
- Grid role
- Utility-scale wind generation in ERCOT's energy-only market.
- Grid connection
- Post Oak 2 substation (connects to ONCOR Long Creek Switching Station) · 138 kV · ONCOR.
Structured profile
- Reported capacity
- 200 MW
Onshore Wind Turbine
- Interconnection
- Post Oak 2 substation (connects to ONCOR Long Creek Switching Station)
138 kV · ONCOR
- Asset role
- wind
ERCOT · Shackelford County
Units and generators
Operating generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 200 MW 200 MW summer | Onshore Wind Turbine Wind · WT | Mar 2008 | Operating |
Performance
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Peer context
- Technology capacity
- 200 MW
- National rank
- #276
- TX rank
- #93
Monthly generation
Download CSVMonthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
Grid and market context
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Nearby substations
HIFLD infrastructure inventoryRelated parties and identifiers
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Relationship graph
Drag organizations to explore the network. Select a node to pin its details and available page link.
Parties and identifiers
| Relationship | Entity | Basis |
|---|---|---|
| Owner / developer | Horizon Wind Energy LLC | PUCT registration states Horizon owns 100% of Post Oak Wind LLC. |
| Grid selection | plant:plant-56483 | Canonical asset page /ercot/assets/plant/post-oak-wind-llc. |
Reporting portfolio
| Largest reported plants | Capacity | State |
|---|---|---|
| Post Oak Wind LLCCurrent | 200 MW | TX |
| Mesquite Wind Power LLC | 200 MW | TX |
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
View full reporting portfolioTimeline and sources
Project milestones and public references behind the asset profile.
Project timeline
- Expected start generating (developer filing)Source
PUC registration indicated the wind farm expected to begin generating electricity by July 2007 (developer/registration filing).
- Planned Commercial OperationSource
PUC registration indicated the wind farm expected to be fully operational in December 2007 (developer/registration filing).
- Generator enters operationEIA-860
EIA-860 lists generator 1 with this operating date.
- ERCOT Interconnection AmendmentSource
A recorded ERCOT interconnection document (Amendment No.2, GIR 04INR0011a – POST OAK WIND (LONE STAR II)) is dated Feb 9, 2026 (administrative/interconnection filing).
Sources
Related assets
Similar plants ranked by technology, capacity, and distance.
Mesquite Wind Power LLC
Wind · 200 MW
Shackelford County
King Creek Wind Farm 2, LLC
Wind · 209 MW
Throckmorton County
Buffalo Gap 3 Wind Farm
Wind · 170.2 MW
Nolan County
Buffalo Gap 2 Wind Farm
Wind · 232.5 MW
Nolan County