PJMPre-Emergency Load Mgmt Reduction Action
Pre-Emergency Load Mgmt Reduction Action: AECO, AEP, BGE, DAY, DEOK, Dominion, DPL, Duquesne, EKPC, FE-AP (APS), FE-ATSI (ATSI), FE-JC (JCPL), FE-ME (Met-Ed), FE-PN (Penelec), PECO, Pepco, PPL, PSEG
EmergencyEnded 24h ago
PJM · posted Oct 14, 1:54 PM EDT
Demand response dispatched · Capacity Performance DR
AECO, AEP, BGE, DAY, DEOK, Dominion, DPL, Duquesne, EKPC, FE-AP (APS), FE-ATSI (ATSI), FE-JC (JCPL), FE-ME (Met-Ed), FE-PN (Penelec), PECO, Pepco, PPL, PSEG
What PJM posted
PJM postingDemand response dispatched · Capacity Performance DR
- Lead times
- Long_120, Short_60
- Products
- Capacity Performance DR
Full posting
A Pre-Emergency Load Mgmt Reduction Action has been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Long_120,Short_60 . Product(s) dispatched: Capacity Performance DR
Step
4
Operator procedure
- Step