Onshore Wind TurbineNYISO · Steuben Countyplant:plant-60596

Baron Winds Farm

Baron Winds LLC - Steuben County - NYISO

Baron Winds Farm (EIA plant code 60596) is the operational Phase I / Baron Winds 1 wind facility in Steuben County, New York, developed, owned, and operated by Baron Winds LLC through the RWE corporate group. Phase I consists of 32 onshore wind turbines—24 Vestas V150-4.2 MW units and 8 Gamesa G114 2.625 MW units—with approximately 122 MW of installed capacity. The facility achieved commercial operation in December 2022 and is connected to the New York grid at the Canandaigua substation (230 kV NYSEG interconnection). Baron Winds Farm is the largest onshore wind-energy generator in Steuben County and is capable of supplying electricity equivalent to the annual demand of approximately 50,000 U.S. homes.

Overview

Key fields

Nameplate capacity
130 MW

Canonical EIA plant baseline.

Registry anchor
Plant 60596

plant-60596

Structured profile

Technology
Onshore Wind Turbine
Operator
Baron Winds LLC

Units and generators

Operating generator records and technology attributes reported through EIA-860.

GeneratorCapacityTechnologyOperationStatus
1130 MW
130 MW summer
Onshore Wind Turbine
Wind · WT
Feb 2023Operating

Performance

Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.

Peer context

Technology capacity
130 MW
Onshore Wind Turbine
National rank
#539
of 1,362 operating peers
NY rank
#3
of 32 operating peers

Monthly generation

Download CSV
Latest 12 months
311.3 GWh
Reported net generation
Latest report
Apr 2026
EIA-923 monthly filing
2025 capacity factor
29.8%
Using current reported nameplate capacity
May 2023: 19.2 GWh2023-05Jun 2023: 17 GWhJul 2023: 12.4 GWhAug 2023: 17.9 GWhSep 2023: 13.1 GWhOct 2023: 29.4 GWhNov 2023: 38.3 GWh2023-11Dec 2023: 35.7 GWhJan 2024: 33.9 GWhFeb 2024: 31.2 GWhMar 2024: 40.2 GWhApr 2024: 35.5 GWhMay 2024: 22.8 GWh2024-05Jun 2024: 26.9 GWhJul 2024: 11.8 GWhAug 2024: 17.6 GWhSep 2024: 18 GWhOct 2024: 30.7 GWhNov 2024: 41.6 GWh2024-11Dec 2024: 33.5 GWhJan 2025: 40.5 GWhFeb 2025: 23.4 GWhMar 2025: 50.1 GWhApr 2025: 38.6 GWhMay 2025: 35.3 GWh2025-05Jun 2025: 25.8 GWhJul 2025: 15.6 GWhAug 2025: 14.4 GWhSep 2025: 7.8 GWhOct 2025: 24.1 GWhNov 2025: 40.9 GWh2025-11Dec 2025: 23 GWhJan 2026: 33.9 GWhFeb 2026: 24.4 GWhMar 2026: 31.9 GWhApr 2026: 34.1 GWh2026-04

Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.

Grid and market context

Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.

Nearby substations

HIFLD infrastructure inventory
IN SERVICE · 115 kV
3.8 km
IN SERVICE
7.5 km
IN SERVICE · 115 kV
8.0 km
IN SERVICE
8.1 km
IN SERVICE
8.2 km

Commercial, land, and environmental record

Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.

Transactions and agreements

Regulatory Approval
Apr 27, 2020
New York State Board on Electric Generation Siting and the Environment approved the Baron Winds Project to proceed in two separate phases (Phase I and Phase II).
Baron Winds LLC · New York State Board on Electric Generation Siting and the Environment
americas.rwe.com
Regulatory Record
Jul 1, 2020
Baron Winds LLC recorded as owner and controlling entity in FERC MBR asset appendix for Baron Winds Farm, plant code 60596, with capacity rating 122.00 MW.
Baron Winds LLC · FERC
mbrweb.ferc.gov
Construction Start
May 2021
Construction of Baron Winds Phase I commenced, generating more than 300 local jobs.
Baron Winds LLC
americas.rwe.com
Commercial Operation
Dec 2022
Baron Winds Farm Phase I achieved commercial operation and became fully connected to the New York grid.
Baron Winds LLC · NYISO
americas.rwe.com
Operational Confirmation
Nov 3, 2023
RWE commemorated Baron Winds 1 as fully operational with 32 wind turbines (24 Vestas, 8 Siemens Gamesa), 122 MW capacity, capable of supplying power to approximately 50,000 homes annually.
RWE Clean Energy · Baron Winds LLC
americas.rwe.com

Related parties and identifiers

Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.

Relationship graph

Drag organizations to explore the network. Select a node to pin its details and available page link.

AssetOwner / operatorEquipmentOrganizationMarket / regulator

Parties and identifiers

RelationshipEntityBasis
OwnerRWE Renewables Development, LLCDirect parent company
OwnerRWE Renewables Americas, LLCUpstream parent; developer and operator group
OwnerRWE AGUltimate parent company
Equipment supplierVestasTurbine manufacturer
Equipment supplierSiemens GamesaTurbine manufacturer
Transmission owner / interconnecting utilityNew York State Electric & Gas Corporation (NYSEG)Transmission owner and interconnecting utility
Balancing authority / market operatorNew York Independent System Operator, Inc. (NYISO)Market operator and balancing authority
Former ownerEverpower Wind Holdings, Inc.Former owner
Former ownerinnogy Renewables US LLCInterim owner / acquirer from Everpower
Grid selectionplant:plant-60596Canonical asset page /nyiso/assets/plant/baron-winds-farm.

Reporting portfolio

EIA reporting entity
RWE Clean Energy
Entity 67192
Operating portfolio
151 plants
25 states
Reported capacity
12,717.5 MW
Batteries · Onshore Wind Turbine · Solar Photovoltaic
Largest reported plants in this portfolio
Largest reported plantsCapacityState
Bright Arrow Solar, LLC403.6 MWTX
Cartwheel 1 - Storage, LLC300 MWTX
Peregrine Solar300 MWTX
Fifth Standard Solar PV, LLC (Hybrid)287 MWCA
Radfords Run Wind Farm278 MWIL
Emily Solar, LLC273.6 MWIL
Copper Mountain Solar 3255 MWNV
Copper Mountain Solar 5, LLC252 MWNV

Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.

View full reporting portfolio

Timeline and sources

Project milestones and public references behind the asset profile.

Project timeline

  1. Ownership transfer from Everpower to innogyamericas.rw...

    New York State Commission approved transfer of 100% of Baron Winds' upstream ownership interests from Everpower Wind Holdings, Inc. to innogy Renewables US LLC through IRUS Wind Development LLC.

  2. Phased project approval grantedamericas.rw...

    New York State Board on Electric Generation Siting and the Environment approved the Baron Winds Project to proceed in two separate phases (Phase I and Phase II).

  3. FERC MBR asset control recordmbrweb.ferc...

    Baron Winds LLC recorded as owner and controlling entity in FERC MBR asset appendix for Baron Winds Farm, plant code 60596, with capacity rating 122.00 MW.

  4. Construction Commencedamericas.rw...

    Construction of Baron Winds Phase I commenced, generating more than 300 local jobs.

  5. Commercial Operation Dateamericas.rw...

    Baron Winds Farm Phase I achieved commercial operation and became fully connected to the New York grid.

  6. Generator enters operationEIA-860

    EIA-860 lists generator 1 with this operating date.

  7. Public dedication and operational confirmationamericas.rw...

    RWE commemorated Baron Winds 1 as fully operational with 32 wind turbines (24 Vestas, 8 Siemens Gamesa), 122 MW capacity, capable of supplying power to approximately 50,000 homes annually.

Common questions about Baron Winds Farm

Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.

How big is Baron Winds Farm?

Baron Winds Farm has a reported capacity of 130 MW. Source: EIA Form 860M.

What kind of plant is Baron Winds Farm?

Baron Winds Farm is a Onshore Wind Turbine facility in Steuben County, NY, participating in the NYISO market.

Where is Baron Winds Farm located?

Baron Winds Farm is in Steuben County, NY, inside the NYISO balancing area.

Who operates Baron Winds Farm?

Baron Winds Farm is operated by RWE Clean Energy according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.

How much electricity does Baron Winds Farm generate?

Baron Winds Farm reported 311.3 GWh over the twelve months to 2026-04. Figures are net generation as filed to EIA-923.

How does Baron Winds Farm compare to other plants?

By capacity, Baron Winds Farm ranks #539 of 1,362 operating plants of the same technology nationally. It ranks #3 of 32 in NY.

Asset analyst
plant:plant-60596

Ask about Baron Winds Farm

Investigate technology, capacity, output, price behavior, ownership, and related facilities using this profile plus current grid data.