Azure Sky Solar is a co-located solar-and-storage plant in Haskell County, Texas. EIA's May 2026 inventory reports a 225 MWac / 283.9 MWdc solar generator dated July 2021 and a separate 91.2 MW / 80.5 MWh battery generator dated June 2022.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA May 2026
Enel
EIA plant 63905 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| ASKYB | Batteries | Operating | 91.2 | 80.5 |
| ASKYS | Solar Photovoltaic | Operating | 225 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| ASKYB | 91.2 MW 91.2 MW summer | Batteries BA | Jun 2022 | Operating |
| ASKYS | 225 MW 225 MW summer | Solar Photovoltaic PV | Jul 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Project milestones and public references behind the asset profile.
EIA reports July 2021 for the solar record.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
3 ERCOT market resources · Battery / storage, Solar
Cycles/day is discharged energy vs. usable capacity (~128 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at AZURE_RN over 365 days (2025-10-26 to 2026-10-25).
The TB1 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the cheapest and dearest hour of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
EIA reports June 2022 for the battery record.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Azure Sky Solar reports 91.2 MW battery storage + 225 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Azure Sky Solar is a Batteries; Solar Photovoltaic; facility in Haskell County, TX, participating in the ERCOT market.
Azure Sky Solar is in Haskell County, TX, inside the ERCOT balancing area.
Azure Sky Solar is operated by Azure Sky Solar Project, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Azure Sky Solar reported 489.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Azure Sky Solar ranks #135 of 7,597 operating plants of the same technology nationally. It ranks #59 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.