Azure Sky Wind Project is a wind-and-battery hybrid in Throckmorton County, Texas. EIA's May 2026 inventory reports a 350.2 MW wind generator and a 120 MW / 190 MWh battery, totaling 470.2 MW nameplate and seasonal capability.
EIA May 2026
EIA May 2026
EIA plant 64164 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| ASWBE | Batteries | Operating | 120 | 190 |
| ASWWT | Onshore Wind Turbine | Operating | 350.2 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| ASWBE | 120 MW 120 MW summer | Batteries BA | Dec 2023 | Operating |
| ASWWT | 350.2 MW 350.2 MW summer | Onshore Wind Turbine WT | Aug 2024 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports December 2023 for battery generator ASWBE.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
5 ERCOT market resources · Battery / storage, Wind
Cycles/day is discharged energy vs. usable capacity (~202 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at VORT_ALL_RN over 365 days (2025-10-26 to 2026-10-25).
The TB1 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the cheapest and dearest hour of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports August 2024 for wind generator ASWWT.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Azure Sky Wind Project, LLC reports 120 MW battery storage + 350.2 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Azure Sky Wind Project, LLC is a Batteries; Onshore Wind Turbine; facility in Throckmorton County, TX, participating in the ERCOT market.
Azure Sky Wind Project, LLC is in Throckmorton County, TX, inside the ERCOT balancing area.
Azure Sky Wind Project, LLC is operated by Azure Sky Wind Project, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Azure Sky Wind Project, LLC reported 1,240.2 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Azure Sky Wind Project, LLC ranks #39 of 1,374 operating plants of the same technology nationally. It ranks #14 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.