High River Energy Center, LLC
High River Energy Center is a 90 MW utility-scale solar photovoltaic facility in the Town of Florida, Montgomery County, New York, in NYISO Zone F. High River Energy Center, LLC, formed in August 2017, is an indirect wholly owned subsidiary of NextEra Energy Resources, LLC. The project consists of commercial-scale solar arrays using Jinko 415 W and Safe Harbor 370 W photovoltaic modules (322,010 total modules), 12,385 strings of DC-coupled arrays with both fixed-tilt and single-axis tracking systems, and 28 Power Electronics FS3350MVA inverters rated 3.465 MW each. The facility generates electricity at 34.5 kV internally, steps voltage to 115 kV at an on-site collection substation, and interconnects through a Point of Interconnection switchyard to National Grid's existing Stoner-Rotterdam #12 115 kV transmission line via a 500-foot 115 kV transmission line.