Horse Creek Wind Farm is a 230 MW wind facility in Haskell County, Texas. EIA's May 2026 inventory lists one operating aggregate generator under Plant ID 60339, with service beginning in October 2016 and Horse Creek Wind LLC as the registered operator.
EIA
Lotus
Lotus
EIA
EIA plant 60339 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| HCWF | Onshore Wind Turbine | Operating | 230 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| HCWF | 230 MW 230 MW summer | Onshore Wind Turbine WT | Oct 2016 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Project milestones and public references behind the asset profile.
EIA reports October 2016.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Wind
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at HORSECRK_RN over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Horse Creek Wind Farm reports 230 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Horse Creek Wind Farm is a Onshore Wind Turbine facility in Haskell County, TX, participating in the ERCOT market.
Horse Creek Wind Farm is in Haskell County, TX, inside the ERCOT balancing area.
Horse Creek Wind Farm is operated by Horse Creek Wind, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Horse Creek Wind Farm reported 811.9 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.
Horse Creek Wind Farm settles at HORSECRK_RN.
By capacity, Horse Creek Wind Farm ranks #185 of 1,374 operating plants of the same technology nationally. It ranks #64 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.