Prospero Solar II is a 250 MWac / 331 MWdc photovoltaic facility in Andrews County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 64325, with service beginning in August 2021 and Prospero Solar II LLC as the registered operator. Longroad Energy reports that it owns and operates the project, which covers more than 2,670 acres and was financed as an approximately $320 million investment. DaVita and Zimmer Biomet contracted for output under 15-year power-purchase agreements.
Mapped infrastructure geometry associated with this asset.
Equipment field view for comparing module and inverter scale. Not a site map.
EIA May 2026
Longroad Energy
Official project page
15-year agreements
EIA plant 64325 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| PROSP | Solar Photovoltaic | Operating | 250 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| PROSP | 250 MW 250 MW summer | Solar Photovoltaic PV | Aug 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Longroad announced financing for the approximately $320 million project.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at PRSPERO2_ALL over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports August 2021.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Prospero Solar II reports 250 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Prospero Solar II is a Solar Photovoltaic facility in Andrews County, TX, participating in the ERCOT market.
Prospero Solar II is in Andrews County, TX, inside the ERCOT balancing area.
Prospero Solar II is operated by Prospero Solar II, LLC (Longroad) according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Prospero Solar II reported 660.3 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Prospero Solar II settles at PRSPERO2_ALL.
By capacity, Prospero Solar II ranks #86 of 7,597 operating plants of the same technology nationally. It ranks #37 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.