Rio Bravo is a 237.6 MW wind facility in Starr County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 61865, with service beginning in June 2019. BHE Renewables acquired full ownership effective March 28, 2025 and describes the project as 237 MW with 66 Vestas 3.6 MW turbines.
EIA
BHE Renewables
BHE Renewables
EIA plant 61865 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | Operating | 237.6 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 237.6 MW 237.6 MW summer | Onshore Wind Turbine WT | Jun 2019 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Wind
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at CABEZON_ALL over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
BHE moved from tax-equity and partial ownership to full ownership.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Rio Bravo Windpower reports 237.6 MW wind of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Rio Bravo Windpower is a Onshore Wind Turbine facility in Starr County, TX, participating in the ERCOT market.
Rio Bravo Windpower is in Starr County, TX, inside the ERCOT balancing area.
Rio Bravo Windpower is operated by Rio Bravo Windpower, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Rio Bravo Windpower reported 725.5 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Rio Bravo Windpower settles at CABEZON_ALL.
By capacity, Rio Bravo Windpower ranks #177 of 1,374 operating plants of the same technology nationally. It ranks #60 of 230 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.