Taygete II Energy Project is a 203.8 MWac / 258.4 MWdc solar facility in Pecos County, Texas. EIA's May 2026 inventory lists West Texas Solar Project II LLC as the registered operator and July 2023 as the service month. The project's Chapter 313 record identifies the company as West Texas Solar Project II LLC, formerly Taygete Energy Project II LLC. Its 2019 application described a planned 255 MWac project on approximately 3,500 leased acres; those development-stage figures are not presented as the final operating configuration.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
EIA May 2026
Texas Comptroller
2019 application
EIA plant 64075 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| TAYG2 | Solar Photovoltaic | Operating | 203.8 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| TAYG2 | 203.8 MW 203.8 MW summer | Solar Photovoltaic PV | Jul 2023 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Project milestones and public references behind the asset profile.
The application described a planned 255 MWac solar project on approximately 3,500 leased acres.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
2 ERCOT market resources · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at TAYGETE2_ALL over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
The Comptroller record documents the project-company name transition to West Texas Solar Project II LLC.
EIA reports July 2023.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Taygete II Energy Project reports 203.8 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Taygete II Energy Project is a Solar Photovoltaic facility in Pecos County, TX, participating in the ERCOT market.
Taygete II Energy Project is in Pecos County, TX, inside the ERCOT balancing area.
Taygete II Energy Project is operated by West Texas Solar Project II LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Taygete II Energy Project reported 460.9 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Taygete II Energy Project settles at TAYGETE2_ALL.
By capacity, Taygete II Energy Project ranks #148 of 7,597 operating plants of the same technology nationally. It ranks #66 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.