PJM–Southeast seam
PJM ↔ Southeast · Market seam (every AC tie between two markets)
PJM's ties to the Carolinas, TVA and Kentucky utilities to its south.
Operator readings
Compare each operator’s reading at its stated time. Scheduled transfers and metered physical flow measure different things.
- As PJM reports it
- 3,022 MW · Southeast → PJM
Current reading · as of Nov 10, 6:40 PM EST
Last 30 days
Hourly readings, signed so that up is power leaving the market. Each series identifies whether it measures flow or a transfer schedule.
Above zero: PJM → Southeast. Below: the reverse.
- Usual direction
- Southeast → PJM in 99% of hours
1% out, 99% in, 0% idle across 721 hours
- Average
- 3,160 MW · Southeast → PJM
- When busy
- 4,484 MW
95th percentile of hourly flow either way
- Peak PJM → Southeast
- 1,518 MW
- Peak Southeast → PJM
- 5,327 MW
- Direction changes
- 4
Sources and method
Readings come from PJM interface readings. Each value is shown with its operator and source time; direction is normalized from that operator’s sign convention toward or away from PJM. A rating describes the equipment; an operator’s posted directional limit, when available, is a separate operating value. The map point identifies a sourced terminal or crossing where available, or a representative connection point; it does not trace the full route.