Hydro-Québec logo

HQ Hydro-Québec Transmission Connection Requests

Requests to connect generation, storage and load to Hydro-Québec's transmission system, with the status of each impact study: Québec's interconnection queue.

About this data

Each row is a request to connect generation, storage or load to Hydro-Québec's transmission system, with the status of its impact study. It serves as Québec's interconnection queue and is updated as Hydro-Québec updates its request list.

What people use it for

  • See what is waiting to connect in Québec
  • Follow impact study status
  • Compare requests by type

TermsInterconnection queue

Where to use it

In Ask the Grid

Ask about it, see it live

The grid agent reads it to answer questions about Hydro-Québec. Every answer names the data it read and links back here.

In ATG Data

Build with the full table

Schema, full history, coverage and query rules live in Data, where you can browse every row, run SQL and connect it to your own code.

Plans and access

Latest data

Loading…

Questions

Which data provider has HQ Hydro-Québec Transmission Connection Requests data?
Ask the Grid has it, from Hydro-Québec open data (CC BY-NC 4.0). You can browse every row in Ask the Grid Data, query it with SQL or the Ask the Grid API, or ask the grid agent about it in plain English.
Where does HQ Hydro-Québec Transmission Connection Requests come from?
It comes from Hydro-Québec open data (CC BY-NC 4.0). This page links to the original publication, so any value can be checked against it.
How do I download or query HQ Hydro-Québec Transmission Connection Requests?
Open the hydroquebec.impact_studies table in Ask the Grid Data to browse every row and run SQL against it, or call it from code through the Ask the Grid API. Full history can be delivered on a schedule to Snowflake, Databricks or your own storage.
Can I ask questions about HQ Hydro-Québec Transmission Connection Requests in plain English?
Yes. The grid agent reads this data when a question needs it, for example "what is in hydro-québec's interconnection queue", and every answer names the dataset it read.