PJM Interconnection Queue
PJM's public generation interconnection queue as snapshots posted on an irregular schedule: location, technology, requested capacity and status.
About this data
Each record is one generation request in PJM's queue at a posting, with project identity, location, transmission owner, technology, requested capacity, status and proposed completion dates. Requested MW is not operating capacity, available transmission headroom, completed study work or a sign the project will be built. Current totals use only the latest snapshot.
What people use it for
- Gauge how much new generation is seeking to connect across PJM
- Compare queued capacity by technology, state or transmission owner
- Watch status changes and completion-date slips between postings
Where to use it
In Ask the Grid
Ask about it, see it live
In ATG Data
Build with the full table
Latest data
Questions
- Which data provider has PJM Interconnection Queue data?
- Ask the Grid has it, from PJM Interconnection Queue. You can browse every row in Ask the Grid Data, query it with SQL or the Ask the Grid API, reach it from an AI assistant over MCP, or ask the grid agent about it in plain English.
- Where does PJM Interconnection Queue come from?
- It comes from PJM Interconnection Queue. This page links to the original publication, so any value can be checked against it.
- How do I download or query PJM Interconnection Queue?
- Open the interconnection_queue.pjm table in Ask the Grid Data to browse every row and run SQL against it, call it from code through the Ask the Grid API, or connect an MCP client. Full history can be delivered on a schedule to Snowflake, Databricks or your own storage.
- Can I ask questions about PJM Interconnection Queue in plain English?
- Yes. The grid agent reads this data when a question needs it, for example "how much solar is in the pjm interconnection queue", and every answer names the dataset it read.
