Natural Gas Fired Combustion TurbineNYISO · Suffolk Countyplant:plant-55786

Edgewood Energy LLC

MPH Cross Island Power, LLC - Suffolk County - NYISO

Edgewood Energy LLC is an 88 MW natural-gas-fired simple-cycle combustion-turbine power plant located in Brentwood, New York, within the Long Island submarket of NYISO. The facility comprises two GE LM6000 PC Sprint turbine generators, each rated 50 MW, and includes selective catalytic reduction (SCR) units, generator step-up transformers, gas-compression equipment, mechanical and electrical support buildings, water-injection systems, a sound wall, and an oil tank farm. Constructed between February and July 2002 by Phoenix Power Group under a fast-track schedule for Pennsylvania Power & Light, the plant has operated continuously since July 2002. Its output is sold to the Long Island Power Authority to meet peak-load demand and provide local grid reliability in western Suffolk County. The facility interconnects to LIPA's 69 kV grid at the Brentwood transmission node and is part of the NYISO balancing authority and Long Island submarket. As of January 2025, Edgewood is owned and operated by MPH Cross Island Power LLC, a special-purpose vehicle controlled by Hull Street Energy and operating within the Milepost Power generation portfolio.

Overview

Key fields

Nameplate capacity
100 MW

Canonical EIA plant baseline.

Registry anchor
Plant 55786

plant-55786

Structured profile

Technology
Natural Gas Fired Combustion Turbine
Operator
MPH Cross Island Power, LLC

Units and generators

Operating generator records and technology attributes reported through EIA-860.

GeneratorCapacityTechnologyOperationStatus
CT0150 MW
42.5 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 2002Operating
CT0250 MW
42.5 MW summer
Natural Gas Fired Combustion Turbine
Natural Gas · GT
Jul 2002Operating

Performance

Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.

Peer context

Technology capacity
100 MW
Natural Gas Fired Combustion Turbine
National rank
#373
of 825 operating peers
NY rank
#8
of 31 operating peers

Monthly generation

Download CSV
Latest 12 months
39.9 GWh
Reported net generation
Latest report
Dec 2024
EIA-923 monthly filing
2024 capacity factor
4.5%
Using current reported nameplate capacity
Jan 2022: 10.5 GWh2022-01Feb 2022: 9.7 GWhMar 2022: 10.6 GWhApr 2022: 11.6 GWhMay 2022: 13.6 GWhJun 2022: 14.2 GWhJul 2022: 19.2 GWh2022-07Aug 2022: 19.1 GWhSep 2022: 13 GWhOct 2022: 12.2 GWhNov 2022: 11.3 GWhDec 2022: 12 GWhJan 2023: 11.5 GWh2023-01Feb 2023: 6 GWhMar 2023: 11 GWhApr 2023: 6.7 GWhMay 2023: 4.3 GWhJun 2023: 8.1 GWhJul 2023: 18.2 GWh2023-07Aug 2023: 12.7 GWhSep 2023: 9.7 GWhOct 2023: 7 GWhNov 2023: 953 MWhDec 2023: 1.1 GWhJan 2024: 751 MWh2024-01Feb 2024: 946 MWhMar 2024: 750 MWhApr 2024: 1.1 GWhMay 2024: 1.7 GWhJun 2024: 8.7 GWhJul 2024: 13.2 GWh2024-07Aug 2024: 5.5 GWhSep 2024: 703 MWhOct 2024: 1.8 GWhNov 2024: 1.8 GWhDec 2024: 3 GWh2024-12

Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.

Grid and market context

Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.

Nearby substations

HIFLD infrastructure inventory
IN SERVICE · 69 kV
0.2 km
IN SERVICE
1.7 km
IN SERVICE · 69 kV
3.4 km
IN SERVICE
3.8 km
IN SERVICE
4.1 km

Commercial, land, and environmental record

Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.

Transactions and agreements

Construction Commenced
Feb 2002
Phoenix Power Group and partner construction company began construction of the Edgewood simple-cycle power plant on a fast-track design-build basis.
Phoenix Power Group · Edgewood Energy (PPL subsidiary)
phoenixpg.com
Ownership Transfer
2009
J-Power USA Generation, L.P. acquired 100% ownership of Edgewood Energy from Pennsylvania Power & Light Company subsidiary.
Pennsylvania Power & Light Company · J-Power USA Generation, L.P.
lipower.org
Agreement Amendment
2018
J-Power USA and PSEG Long Island agreed to five-year extension of power purchase agreement with improved pricing terms and Edgewood assuming property tax responsibility. Total cost of extension estimated at approximately $48 million. Agreement extended Edgewood's operation through 2023.
$48MJ-Power USA Generation, L.P. · Long Island Power Authority (LIPA) / PSEG Long Island
lipower.org
Regulatory Filing
Aug 13, 2024
MPH Cross Island Power, LLC and the project companies (Edgewood Energy, LLC; Shoreham Energy, LLC; Pinelawn Power LLC; and Equus Power I, L.P.) filed verified petition with New York Public Service Commission for declaratory ruling regarding transfer of ownership interests to MPH.
MPH Cross Island Power, LLC · Edgewood Energy, LLC · New York Public Service Commission
documents.dps.ny.gov
Regulatory Approval
Dec 23, 2024
New York Public Service Commission issued declaratory ruling approving the proposed transfer of ownership interests in Edgewood and the other project companies to MPH Cross Island Power without requiring further review; consistent with Climate Leadership and Community Protection Act compliance; facility operations to remain unchanged.
New York Public Service Commission · MPH Cross Island Power, LLC · Edgewood Energy, LLC
documents.dps.ny.gov

Related parties and identifiers

Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.

Relationship graph

Drag organizations to explore the network. Select a node to pin its details and available page link.

AssetMarket / regulatorOfftakerContractorEquipmentOwner / operator

Parties and identifiers

RelationshipEntityBasis
Portfolio owner / operatorMPH Cross Island Power, LLCFinancing covers a portfolio that includes Edgewood Energy LLC.
Parent companyMilepost Power HoldingsAffiliated portfolio owner and operational platform of Hull Street Energy.
Parent company / acquirerHull Street Energy, LLCAcquiring parent company; controls generation through Milepost Power platform and MPH Cross Island Power special-purpose entities.
Former owner / sellerJ-Power USA Generation, L.P.Former owner and seller; held indirect ownership through J-POWER Sound Capital, LLC and J-POWER Sound Partners, LLC.
Balancing authority / market operatorNew York Independent System Operator (NYISO)Market operator and balancing authority; administers Long Island submarket where Edgewood participates.
Offtaker / power marketerLong Island Power Authority (LIPA)Primary power purchaser; all output delivered to LIPA 69 kV grid; extended PPA agreement through 2023 (as of 2018).
Construction contractorPhoenix Power GroupGeneral contractor responsible for construction, equipment installation, and commissioning.
Equipment supplierGE Vernova (General Electric)Original and current OEM for LM6000 PC Sprint aeroderivative gas turbines installed at Edgewood.
Financial advisorTroutman Pepper Hamilton Sanders LLPLegal counsel to acquirer (Hull Street Energy) in ownership transfer transaction.
Financial advisorBaker McKenzieLegal counsel to seller (J-Power USA) in ownership transfer transaction.
Portfolio financial advisorCIBC Capital MarketsFinancing covers a portfolio that includes Edgewood Energy LLC.
Portfolio financial advisorMerit Capital AdvisorsFinancing covers a portfolio that includes Edgewood Energy LLC.
Grid selectionplant:plant-55786Canonical asset page /nyiso/assets/plant/edgewood-energy-llc.

Reporting portfolio

EIA reporting entity
MPH Cross Island Power
Entity 66974
Operating portfolio
2 plants
1 states
Reported capacity
200 MW
Natural Gas Fired Combustion Turbine · Petroleum Liquids
Largest reported plants in this portfolio
Largest reported plantsCapacityState
Edgewood Energy LLCCurrent100 MWNY
Shoreham Energy LLC100 MWNY

Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.

View full reporting portfolio

Timeline and sources

Project milestones and public references behind the asset profile.

Project timeline

  1. Edgewood Construction Commencedphoenixpg.c...

    Phoenix Power Group and partner construction company began construction of the Edgewood simple-cycle power plant on a fast-track design-build basis.

  2. Generators enter operationEIA-860

    EIA-860 lists generator CT01, generator CT02 with this operating date.

  3. J-Power USA acquires Edgewood from PPLlipower.org

    J-Power USA Generation, L.P. acquired 100% ownership of Edgewood Energy from Pennsylvania Power & Light Company subsidiary.

  4. Edgewood PPA extended through 2023lipower.org

    J-Power USA and PSEG Long Island agreed to five-year extension of power purchase agreement with improved pricing terms and Edgewood assuming property tax responsibility. Total cost of extension estimated at approximately $48 million. Agreement extended Edgewood's operation through 2023.

  5. HSE to acquire New York power plants from J-Power USAhullstreete...

    Hull Street Energy announced agreement to acquire 100% of four New York thermal power plants from J-Power USA Generation, L.P., including Edgewood Energy, Shoreham Energy, Pinelawn Power, and Equus Power, representing a 300 MW Long Island generation portfolio.

  6. Ownership transfer petition filed with NYPSCdocuments.d...

    MPH Cross Island Power, LLC and the project companies (Edgewood Energy, LLC; Shoreham Energy, LLC; Pinelawn Power LLC; and Equus Power I, L.P.) filed verified petition with New York Public Service Commission for declaratory ruling regarding transfer of ownership interests to MPH.

  7. NYPSC approves ownership transfer to MPHdocuments.d...

    New York Public Service Commission issued declaratory ruling approving the proposed transfer of ownership interests in Edgewood and the other project companies to MPH Cross Island Power without requiring further review; consistent with Climate Leadership and Community Protection Act compliance; facility operations to remain unchanged.

  8. HSE completes acquisition of New York power plantshullstreete...

    Hull Street Energy announced completion of 100% acquisition of four New York thermal power plants from J-Power USA Generation, L.P., including Edgewood Energy, as part of Milepost Power fleet. Approximately 2,590 MW of total portfolio capacity following acquisition.

Common questions about Edgewood Energy LLC

Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.

How big is Edgewood Energy LLC?

Edgewood Energy LLC has a reported capacity of 100 MW. Source: EIA Form 860M.

What kind of plant is Edgewood Energy LLC?

Edgewood Energy LLC is a Natural Gas Fired Combustion Turbine facility in Suffolk County, NY, participating in the NYISO market.

Where is Edgewood Energy LLC located?

Edgewood Energy LLC is in Suffolk County, NY, inside the NYISO balancing area.

Who operates Edgewood Energy LLC?

Edgewood Energy LLC is operated by MPH Cross Island Power according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.

How much electricity does Edgewood Energy LLC generate?

Edgewood Energy LLC reported 39.9 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.

How does Edgewood Energy LLC compare to other plants?

By capacity, Edgewood Energy LLC ranks #373 of 825 operating plants of the same technology nationally. It ranks #8 of 31 in NY.

Asset analyst
plant:plant-55786

Ask about Edgewood Energy LLC

Investigate technology, capacity, output, price behavior, ownership, and related facilities using this profile plus current grid data.