Petroleum LiquidsNYISO · Queens Countyplant:plant-56141

Jamaica Bay Peaking

Jamaica Bay Peaking Facility, LLC - Queens County - NYISO

Jamaica Bay Peaking is a 60.5 MW simple-cycle, dual-fuel (natural gas and petroleum liquids) combustion-turbine peaking plant located in Far Rockaway, Queens County, New York. It is interconnected to the 69 kV system in Long Island Power Authority's service territory at the Far Rockaway substation and participates in the New York Independent System Operator wholesale market. After the PPA expired, the facility operated on a merchant basis in the NYISO wholesale market. As of 2024–2025, emissions-control equipment underperformance resulted in deration to approximately 47 MW and prompted a planned retirement notice; however, the facility returned to market service in May 2026 under an interim service agreement with NYISO, reflecting its critical role in supporting Long Island bulk-power-system reliability.

Overview

Key fields

Nameplate capacity
60.5 MW

Canonical EIA plant baseline.

Registry anchor
Plant 56141

plant-56141

Structured profile

Technology
Petroleum Liquids
Operator
Jamaica Bay Peaking Facility, LLC

Units and generators

Operating generator records and technology attributes reported through EIA-860.

GeneratorCapacityTechnologyOperationStatus
260.5 MW
47.3 MW summer
Petroleum Liquids
Kerosene · GT
Jul 2003Operating

Performance

Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.

Peer context

Technology capacity
60.5 MW
Petroleum Liquids
National rank
#92
of 705 operating peers
NY rank
#7
of 25 operating peers

Monthly generation

Download CSV
Latest 12 months
24.5 GWh
Reported net generation
Latest report
Dec 2024
EIA-923 monthly filing
2024 capacity factor
4.6%
Using current reported nameplate capacity
Jan 2022: 4.9 GWh2022-01Feb 2022: 4.1 GWhMar 2022: 4.5 GWhApr 2022: 4.9 GWhMay 2022: 5.8 GWhJun 2022: 6 GWhJul 2022: 8.1 GWh2022-07Aug 2022: 8.1 GWhSep 2022: 5.5 GWhOct 2022: 5.2 GWhNov 2022: 4.8 GWhDec 2022: 5.4 GWhJan 2023: 3.9 GWh2023-01Feb 2023: 10.3 GWhMar 2023: 3.4 GWhApr 2023: 2.9 GWhMay 2023: 3.4 GWhJun 2023: 4.3 GWhJul 2023: 6.2 GWh2023-07Aug 2023: 4.9 GWhSep 2023: 4.5 GWhOct 2023: 3.6 GWhNov 2023: 4.2 GWhDec 2023: 4 GWhJan 2024: 6.1 GWh2024-01Feb 2024: 1.1 GWhMar 2024: 2.4 GWhApr 2024: 1.1 GWhMay 2024: 1.1 GWhJun 2024: 1.2 GWhJul 2024: 1.7 GWh2024-07Aug 2024: 1.4 GWhSep 2024: 1.2 GWhOct 2024: 1.2 GWhNov 2024: 1.4 GWhDec 2024: 4.6 GWh2024-12

Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.

Grid and market context

Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.

Nearby substations

HIFLD infrastructure inventory
NOT AVAILABLE
0.1 km
IN SERVICE · 69 kV
0.2 km
NOT AVAILABLE
2.6 km
IN SERVICE
2.9 km
NOT AVAILABLE
3.0 km

Commercial, land, and environmental record

Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.

Transactions and agreements

Regulatory Approval
Dec 19, 2002
The New York Public Service Commission granted Jamaica Bay Peaking Facility, LLC a Certificate of Public Convenience and Necessity to construct and operate a proposed 48 MW electric generating facility in Far Rockaway.
Jamaica Bay Peaking Facility, LLC · New York Public Service Commission
documents.dps.ny.gov
Operational Milestone
Jul 2, 2003
Jamaica Bay informed the New York Public Service Commission that it commenced commercial operation.
Jamaica Bay Peaking Facility, LLC
documents.dps.ny.gov
Regulatory Approval
Mar 19, 2019
The New York PSC issued a declaratory ruling allowing the upstream transfer from FPL Energy New York to MPH Rockaway Peakers without further review under PSL Section 70.
New York Public Service Commission · MPH Rockaway Peakers, LLC
documents.dps.ny.gov
Operational Issue
Aug 2024
A failure occurred in one of the twin-pack engines at the Bayswater facility. Jamaica Bay's emissions control equipment was underperforming, making it challenging to meet air permit limitations.
Jamaica Bay Peaking Facility, LLC · MPH Rockaway Peakers, LLC
lipower.org
Operational Issue
Jan 2025
Hull Street informed LIPA that it was planning to deactivate both Jamaica Bay and Bayswater due to the high costs of restoration and maintenance. Jamaica Bay was derated to 47 MW as a result of emissions control issues.
Hull Street Energy, LLC · Long Island Power Authority
lipower.org

Related parties and identifiers

Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.

Relationship graph

Drag organizations to explore the network. Select a node to pin its details and available page link.

AssetOwner / operatorOrganizationMarket / regulator

Parties and identifiers

RelationshipEntityBasis
Owner / operatorJamaica Bay Peaking Facility, LLCDirect asset owner and operator
AcquirerHull Street Energy, LLCUltimate parent company and 2019 acquirer
Offtaker / market participantLong Island Power Authority (LIPA)PPA counterparty and proposed capacity purchaser
Balancing authority / market operatorNew York Independent System Operator, Inc. (NYISO)Wholesale market and balancing authority
Transmission owner / interconnecting utilityLong Island Power Authority (LIPA)Transmission owner and interconnection counterparty
RegulatorNew York Public Service Commission (PSC)State regulator with jurisdiction
RegulatorNew York State Department of Environmental Conservation (DEC)Environmental regulator
Grid selectionplant:plant-56141Canonical asset page /nyiso/assets/plant/jamaica-bay-peaking.

Reporting portfolio

EIA reporting entity
Jamaica Bay Peaking Facility, LLC
Entity 49786
Operating portfolio
1 plants
1 states
Reported capacity
60.5 MW
Petroleum Liquids

Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.

Timeline and sources

Project milestones and public references behind the asset profile.

Project timeline

  1. CPCN Authorizationdocuments.d...

    The New York Public Service Commission granted Jamaica Bay Peaking Facility, LLC a Certificate of Public Convenience and Necessity to construct and operate a proposed 48 MW electric generating facility in Far Rockaway.

  2. Generator enters operationEIA-860

    EIA-860 lists generator 2 with this operating date.

  3. Commercial Operation Datedocuments.d...

    Jamaica Bay informed the New York Public Service Commission that it commenced commercial operation.

  4. Acquisition Agreement Announcementhullstreete...

    Hull Street Energy announced that it had entered into a definitive agreement to acquire 100% of the ownership interests in the Bayswater and Jamaica Bay generating stations from a subsidiary of NextEra Energy Resources, LLC.

  5. Ownership Transfer Regulatory Approvaldocuments.d...

    The New York PSC issued a declaratory ruling allowing the upstream transfer from FPL Energy New York to MPH Rockaway Peakers without further review under PSL Section 70.

  6. Acquisition Completionhullstreete...

    Hull Street Energy completed the acquisition of the Bayswater and Jamaica Bay generating stations from a subsidiary of NextEra Energy Resources, LLC.

  7. Equipment Failure and Emissions Control Degradationlipower.org

    A failure occurred in one of the twin-pack engines at the Bayswater facility. Jamaica Bay's emissions control equipment was underperforming, making it challenging to meet air permit limitations.

  8. Planned Deactivation Announcementlipower.org

    Hull Street informed LIPA that it was planning to deactivate both Jamaica Bay and Bayswater due to the high costs of restoration and maintenance. Jamaica Bay was derated to 47 MW as a result of emissions control issues.

  9. Retirement Notice Fileddocuments.d...

    MPH Far Rockaway submitted a notice of intent to retire the Far Rockaway Peakers (Bayswater and Jamaica Bay) to the New York Public Service Commission.

  10. Identified Retirement Date (Not Completed)documents.d...

    Identified retirement date for Far Rockaway Peakers. The facilities could not deactivate on this date because NYISO reliability needs required continued service.

  11. Proposed Capacity Purchase Agreementlipower.org

    LIPA proposed authorizing a 10-year Capacity Purchase Agreement with MPH Rockaway Peakers for purchase of Jamaica Bay and Bayswater capacity, estimated to cost approximately $91 million over the term. The CPA would require restoration to design capability and would begin around March 2026.

  12. Return to Market Servicedocuments.d...

    Jamaica Bay and Bayswater returned to market service effective as of the start of HB 1 on May 1, 2026, following continued operations under an Interim Service Provider agreement. NYISO had identified Jamaica Bay as a component of the selected solution for Long Island bulk-power-system reliability needs.

Common questions about Jamaica Bay Peaking

Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.

How big is Jamaica Bay Peaking?

Jamaica Bay Peaking has a reported capacity of 60.5 MW. Source: EIA Form 860M.

What kind of plant is Jamaica Bay Peaking?

Jamaica Bay Peaking is a Petroleum Liquids facility in Queens County, NY, participating in the NYISO market.

Where is Jamaica Bay Peaking located?

Jamaica Bay Peaking is in Queens County, NY, inside the NYISO balancing area.

Who operates Jamaica Bay Peaking?

Jamaica Bay Peaking is operated by Jamaica Bay Peaking Facility, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.

How much electricity does Jamaica Bay Peaking generate?

Jamaica Bay Peaking reported 24.5 GWh over the twelve months to 2024-12. Figures are net generation as filed to EIA-923.

How does Jamaica Bay Peaking compare to other plants?

By capacity, Jamaica Bay Peaking ranks #92 of 705 operating plants of the same technology nationally. It ranks #7 of 25 in NY.

Co-located assets

Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.

Asset analyst
plant:plant-56141

Ask about Jamaica Bay Peaking