Ask the Grid
MapMarketsAssetsForecastsDataStoriesPricing
Log inAccountCreate free workspaceOpen workspace

CAISO news: California grid and power markets

Follow CAISO news on California electricity markets, renewables, storage and grid operations. Read the coverage, then explore the price map and published demand outlook.

Open CAISO Radar

Connect Ask the Grid

Use Ask the Grid in your AI assistant.

ChatGPTOpen Ask the Grid in the ChatGPT directoryMicrosoft 365 CopilotOpen Ask the Grid in Microsoft Marketplace

Other MCP clients

Connect all markets with this server URL.

https://mcp.askthegrid.com/v1/globalSetup for Claude, Cursor and Codex →Set up a CAISO-only connection →
AllERCOTNYISOCAISOPJMMISOISO-NESPPBPADuke CarolinasDuke Progress EastDuke Progress WestDuke FloridaFPLSouthernTVABaja CaliforniaAESOIESOCENACEHydro-QuébecBC HydroManitoba HydroSaskPowerNB PowerIESO Nova Scotia

Energy news by grid

  • ERCOT news
  • NYISO news
  • CAISO news
  • PJM news
  • MISO news
  • ISO-NE news
  • SPP news
  • BPA news
  • Duke Carolinas news
  • Duke Progress East news
  • Duke Progress West news
  • Duke Florida news
  • FPL news
  • Southern news
  • TVA news
  • Baja California news
  • AESO news
  • IESO news
  • CENACE news
  • Hydro-Québec news
  • BC Hydro news
  • Manitoba Hydro news
  • SaskPower news
  • NB Power news
  • IESO Nova Scotia news
Ask the Grid · Parisi Labs, Inc.
ProductPricingHelpAboutContactTermsUsage policyPrivacy
MapMarketsAssetsForecastsDataStoriesPricing
All markets13,326ERCOT459NYISO111CAISO196PJM663MISO306ISO-NE162SPP73BPADuke CarolinasDuke Progress EastDuke Progress WestDuke FloridaFPLSouthernTVABaja CaliforniaAESOIESOCENACEHydro-QuébecBC HydroManitoba HydroSaskPowerNB PowerIESO Nova Scotia
All markets13,326
ERCOT459
NYISO111
CAISO196
PJM663
MISO306
ISO-NE162
SPP73
BPA
Duke Carolinas
Duke Progress East
Duke Progress West
Duke Florida
FPL
Southern
TVA
Baja California
AESO
IESO
CENACE
Hydro-Québec
BC Hydro
Manitoba Hydro
SaskPower
NB Power
IESO Nova Scotia

AI briefingCAISO · last 24 hours · 5 stories

PG&E interim rate boost, carbon auction prices, and large new demand projects in CA

  1. 1

    Regulators approved PG&E collecting an interim $456 million from customers while the utility has deferred $2 billion of capital projects.

    PG&E secures $456 million rate hike despite putting $2 billion in infrastructure projects on holdfinance.yahoo.com
  2. 2

    The joint Québec–California auction sold current‑vintage and 2029‑vintage GHG units at reported clearing prices in Canadian dollars.

    Results of the November 18, 2026 Québec and California Carbon Markets Auctionfinance.yahoo.com
  3. 3

    A proposed 500 MW data center development called Project Eco would sit on 177 acres and include two data center buildings plus a battery energy storage system.

    500MW data center project planned outside San Diego, Californiadatacenterdynamics.com
  4. 4

    A 5 MW containerized GenEco PEM electrolyzer began commercial operations in Vernon producing about 2.1 metric tons of hydrogen daily to fuel heavy‑duty trucks.

    Plug Power’s GenEco electrolyzer goes live at Avina’s Vernon, California facility, delivering 2.1 metric tons of hydrogen daily near the Port of Long Beachenergiesmedia.com

196 stories

Thu, Nov 26
electrive.com18:30

IONNA opens 22-bay charging hub in California and adds Tesla Autocharge

AI summaryIONNA opened its largest 22-bay charging hub in Westminster, California, featuring 12 CCS and 10 NACS connectors, a 4 MW grid connection, indoor/outdoor amenities and Just Walk Out retail.

Your Watching →Build a report →Wire API →
More stories
DCD17:03

500MW data center project planned outside San Diego, California

AI summaryA 500MW data center development called Project Eco is proposed near Jacumba Hot Springs in San Diego County on 177 acres and would include two data center buildings and a battery energy storage system.

Energies Media02:11

Plug Power’s GenEco electrolyzer goes live at Avina’s Vernon, California facility, delivering 2.1 metric tons of hydrogen daily near the Port of Long Beach

AI summaryAvina Clean Hydrogen’s Vernon, CA facility began commercial operations with Plug Power’s 5 MW containerized GenEco PEM electrolyzer, producing about 2.1 metric tons (2.3 short tons) of hydrogen per day and fueling over 50 heavy‑duty trucks daily.

Wed, Nov 25
Yahoo Finance23:00

PG&E secures $456 million rate hike despite putting $2 billion in infrastructure projects on hold

AI summaryRegulators approved PG&E collecting an interim $456 million from customers while the utility has deferred $2 billion of capital projects.

Yahoo Finance21:01

Results of the November 18, 2026 Québec and California Carbon Markets Auction

AI summaryJoint Québec–California auction sold 49,359,205 current-vintage GHG units (including 139,122 consigned) at CA$46.99 (US$32.88) and 6,481,750 2029-vintage units at CA$47.62 (US$33.32).

Energy Live News16:30

Batteries made from natural gas – without burning a drop

AI summaryA demonstration plant in California run by Molten is producing battery-grade graphite and hydrogen from natural gas without combustion or CO2 emissions. The Oakland facility is operational with 300 tonnes/year graphite anode capacity and reported gas-to-graphite yields above 95%.

Yahoo Finance11:12

Does Plug Power (PLUG) Change The Story With Its California Hydrogen Station?

AI summaryPlug Power electrolyzers are operating at Avina Clean Hydrogen’s new hydrogen refueling station serving heavy-duty fleets in the Los Angeles–Long Beach port corridor, demonstrating commercial use at a high-demand logistics hub.

Los Angeles Times11:00

How one developer plans to build a big data center in L.A. County where NIMBYs won't notice

AI summaryA developer, Ramus Development with Birtcher Development, proposed converting half of the 124-acre California Country Club near Whittier into a 374,000-square-foot data center occupying 18 acres while retaining a nine-hole course and clubhouse.

RTO Insider01:40

E3: Solar+Storage Reduced Thermal Reliance in CAISO, ERCOT

Tue, Nov 24
Energies Media18:40

California’s Shasta Dam uses an underwater temperature-control system to release cold water for salmon while generating electricity

AI summaryShasta Dam installed a multilevel temperature-control intake that draws and blends cold water from different reservoir depths to release through penstocks while using the powerhouse turbines. The U.S. Bureau of Reclamation built the TCD in 1997 to protect winter-run Chinook salmon and preserve hydropower output.

ANS Newswire15:35

INL chooses Guidedwave for fuel canister monitoring demo at SONGS

AI summaryIdaho National Laboratory’s Center for Used Fuel Research will deploy Guidedwave acoustic emission sensors in a one-year demonstration at San Onofre Nuclear Generating Station to monitor a simulated dry storage fuel canister.

Yahoo Finance14:31

EV Realty to expand charging network in California

AI summaryEV Realty broke ground on a 50-port charging hub in Torrance and acquired a site in Ontario as part of its Southern California expansion; the Torrance hub is slated to open in mid-2027 and Ontario construction will begin next year.

DCD13:20

NewYork GreenCloud submits application to build 14.4MW biomass powered data center in Ione, California

AI summaryNewYork GreenCloud has filed to build a 14.4MW, 13,000 sq ft data center at its Buena Vista biomass power site in Ione, California, to be powered directly by the existing plant with excess sold to the grid and using closed-loop cooling.

Los Angeles Times13:00

Permitting reform bill would help green energy projects, but at too high a cost

AI summaryPermitting reform bill (BAAJA) would speed approval of both clean energy and fossil fuel projects, sparking debate over environmental trade-offs; critics warn it would free up more coal, oil and gas and worsen greenhouse gas emissions.

Energy-Storage.News12:42

CMBLU highlights community participation in California long-duration non-lithium battery project for tribal and desert community resilience

AI summaryA 10MW/100MWh non‑lithium flow battery project was announced to support tribal and desert community resilience. The developer CMBLU Energy and California utility Imperial Irrigation District are partnering on IID’s first non‑lithium battery deployment.

Los Angeles Times11:00

Newsom’s utilities commission pushes to pass electricity rate hikes, other industry-friendly measures

AI summaryCalifornia’s Public Utilities Commission, with five Newsom appointees voting, approved two PG&E rate increases allowing the company to bill customers for about $2.2 billion and is poised to approve more utility-friendly measures.

pv magazine Global05:00

Golden State goes all in on VPPs

Mon, Nov 23
RTO Insider23:21

PacifiCorp Pays CAISO $541K in Q3 Under New CRA Rules

The Hill22:38

Key House Democrat will oppose permitting reform bill

Energies Media21:30

Masdar completes $950 million California solar-storage complex spanning 538.7 MW

AI summaryMasdar and partner Igneo Infrastructure Partners (via developer Terra-Gen) completed the Lockhart solar and storage complex in California, a $950 million project. The facility comprises 365 MW of solar capacity and 173.7 MW of battery storage (total 538.7 MW), with about 925,000 panels and 248 battery enclosures.

End of the wire · 20 stories

Live CAISO market context

CAISO market context

Live Radar →

Headline

4 source clocks
Load
17,744MW
▼2,708 MW24hsystem demand
Price
$11.5/MWh
CAISO trading-hub average · Real-time
Renewables
15,949MW
wind + solar
Congestion
$253.32/MWh
6 RT cases shown

LMP by hub & zone

Hubs
NP15$19.39
SP15$8.28
ZP26$6.84
Load zones
PGAE$18.69
SCE$8.5
SDGE$8.84
VEA$8.48

Live readings update separately from the news and emailed briefing.