Aligned West Jordan Data Center Campus
Operating
Operating
The Aligned West Jordan Data Center Campus is an operating campus at 3333 W 9000 S in West Jordan, Salt Lake County, Utah, with three facilities built in phases since the land was bought in 2018. A 2026 Utah legislative table lists 34 MW for SLC-01, 48 MW for SLC-02 and 80 MW for SLC-03. Aligned's 2019 master plan called for 130 MW at full build, and SLC-02 is stated as expandable to 60 MW. Rocky Mountain Power supplies utility power to a dedicated on-site substation. Salt Lake County Health Department opened a noise investigation in 2026.
Two-story build-to-suit project on the hyperscale campus
| Capacity | Basis | Status | Scope | As of |
|---|---|---|---|---|
| Up to 60 MW | Reported IT Power | Proposed | Exact Asset | — |
| SLC-02 expansion capacity stated by the operator | ||||
| 130 MW | Campus Gross Power | Proposed | Exact Asset | — |
| Full-build master plan stated in a 2019 operator release | ||||