Apple's Prineville Data Center is a campus at 1600 SW Baldwin Rd in Prineville, Crook County, Oregon. Apple's 2025 environmental report lists it among the data centers it owns and operates and reports 255 million kWh of electricity use in 2024. In 2016 the campus had two buildings, with a third 330,000 sq ft building and a power substation approved. It is cooled with outside air and indirect evaporative cooling.
Loading map…
Overview
- Campus power
- Not disclosed
- No exact-site MW figure in cited sources.
- Status
- Operating
- Operating campus
- IT floor area
- Not disclosed
- Campus
- Compute profile
- Hyperscale · Cloud
- Cooling design
- Reported
- Outside-air cooling · Indirect evaporative cooling when outside air is too warm · CRAH units in the data halls
- Project scope
Power and grid
- Utility
- Pacific Power
Facility and development
- Construction
- Master plan filed in 2012 for a 160-acre property with two large buildings; by 2016 two buildings stood and a third 330,000 sq ft building, a logistics building and a power substation had been approved.
- Land transaction
- In September 2015 Apple bought just under 200 acres adjacent to the existing facility from Crook County for $3.6 million.
- Facility class
- Hyperscale · Cloud
- Cooling systems
- Outside-air cooling · Indirect evaporative cooling when outside air is too warm · CRAH units in the data halls