Aragorn Solar Project is an operating solar facility with 180 MW of EIA-reported operating capacity in Culberson County, Texas, registered as EIA Plant ID 63329. SB Energy lists the project at 255 MWdc and in operation; the EIA/ERCOT operating record reports a 187.2 MW nameplate unit with a 180 MW summer/winter rating. The plant interconnects at CULBERSON SOLAR WEST.
Mapped infrastructure geometry associated with this asset.
Solar Photovoltaic
Aragorn Solar Project is operating.
ERCOT
ERCOT · Culberson County
EIA plant 63329 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| IPAGN | Solar Photovoltaic | Operating | 187.2 | Unknown |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| IPAGN | 187.2 MW 180 MW summer | Solar Photovoltaic PV | Dec 2021 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
Other project listings report a December 2021 commercial-operation timing; an Austin Energy operations update also references project close-out/availability in mid‑2021 in its program reporting.
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Solar
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at ARAGORN_RN over 365 days (2025-10-27 to 2026-10-26).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Matched to the latest available ERCOT generation-interconnection queue record. Queue status and completion dates describe the queue record; operating status is verified separately against plant and market registrations.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Aragorn Solar Project reports 187.2 MW solar of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Aragorn Solar Project is a Solar Photovoltaic facility in Culberson County, TX, participating in the ERCOT market.
Aragorn Solar Project is in Culberson County, TX, inside the ERCOT balancing area.
Aragorn Solar Project is operated by SE Aragorn, LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Aragorn Solar Project reported 332.7 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
Aragorn Solar Project settles at ARAGORN_RN, on the Electric Reliability Council of Texas system.
By capacity, Aragorn Solar Project ranks #226 of 7,597 operating plants of the same technology nationally. It ranks #88 of 242 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.