Baytown Energy Center is a four-generator natural-gas combined-cycle cogeneration facility in Chambers County, Texas. EIA's May 2026 inventory reports 932.9 MW nameplate, 852 MW net summer, and 819 MW net winter capability across three combustion turbines and one steam turbine, all with June 2002 operating months. The facility supplies electricity and industrial steam. Baytown Energy Center LLC is the registered plant operator; Calpine is now a wholly owned subsidiary of Constellation following the transaction completed January 7, 2026.
Mapped infrastructure geometry associated with this asset.
Calpine operating company
All report June 2002 operating months
Electricity and industrial steam
Federal Operating Permit O2133
EIA plant 55327 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| CTG1 | Natural Gas Fired Combined Cycle | Operating | 219.3 | Unknown |
| CTG2 | Natural Gas Fired Combined Cycle | Operating | 219.3 | Unknown |
| CTG3 | Natural Gas Fired Combined Cycle | Operating | 219.3 | Unknown |
| STG1 | Natural Gas Fired Combined Cycle | Operating | 275 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| CTG1 | 219.3 MW 198 MW summer | Natural Gas Fired Combined Cycle CT | Jun 2002 | Operating |
| CTG2 | 219.3 MW 198 MW summer | Natural Gas Fired Combined Cycle CT | Jun 2002 | Operating |
| CTG3 | 219.3 MW 198 MW summer | Natural Gas Fired Combined Cycle CT | Jun 2002 | Operating |
| STG1 | 275 MW 258 MW summer | Natural Gas Fired Combined Cycle CA | Jun 2002 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator CTG1, generator CTG2, generator CTG3, generator STG1 with this operating date.
| Unknown |
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
6 ERCOT market resources · Combined-cycle gas
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at BTE_BTE_G1 over 365 days (2025-10-27 to 2026-10-26). This plant is also crosswalked to BTE_BTE_G2, BTE_BTE_G3, BTE_BTE_G4, BTE_CC1, BTE_PUN1, BTE_PUN2, EXN_PUN1, EXN_PUN2, EXN_PUN3; the point with the deepest price history is shown.
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Baytown Energy Center entered combined‑cycle operations; commissioning and commercial operation reported in June 2002.
Calpine’s Baytown Carbon Capture project was selected by the U.S. Department of Energy for a cost‑sharing agreement to advance commercial‑scale carbon capture and storage infrastructure.
Reporting indicates Phase 1 funding for the project (reported $270 million) in mid‑2024 as part of the DOE cost‑sharing implementation and project phasing.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Baytown Energy Center reports 932.9 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Baytown Energy Center is a Natural Gas Fired Combined Cycle facility in Chambers County, TX, participating in the ERCOT market.
Baytown Energy Center is in Chambers County, TX, inside the ERCOT balancing area.
Baytown Energy Center is operated by Baytown Energy Center LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Baytown Energy Center reported 4,295.6 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Baytown Energy Center ranks #108 of 540 operating plants of the same technology nationally. It ranks #18 of 68 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.