Channelview Cogeneration Plant is a five-generator natural-gas combined-cycle cogeneration facility in Harris County, Texas. EIA's May 2026 inventory reports 918.3 MW nameplate, 761 MW net summer, and 862.2 MW net winter capability across four combustion turbines and one steam turbine. S&P describes a separate 851 MW project scope and reports that Elliott Investment Management acquired the project from Ares in 2025, with Ares retaining a small stake.
Mapped infrastructure geometry associated with this asset.
EIA May 2026
Ares retained a small stake
$220M term loan · $30M revolver · $10M LOC
2001-2002 vintages
EIA plant 55187 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| GT1 | Natural Gas Fired Combined Cycle | Operating | 192.1 | Unknown |
| GT2 | Natural Gas Fired Combined Cycle | Operating | 192.1 | Unknown |
| GT3 | Natural Gas Fired Combined Cycle | Operating | 192.1 | Unknown |
| GT4 | Natural Gas Fired Combined Cycle | Operating | 192.1 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| GT1 | 192.1 MW 161.7 MW summer | Natural Gas Fired Combined Cycle CT | Jun 2002 | Operating |
| GT2 | 192.1 MW 155.4 MW summer | Natural Gas Fired Combined Cycle CT | Jun 2002 | Operating |
| GT3 | 192.1 MW 155.9 MW summer | Natural Gas Fired Combined Cycle CT | Jun 2002 | Operating |
| GT4 | 192.1 MW 156.8 MW summer | Natural Gas Fired Combined Cycle CT | Aug 2001 | Operating |
| ST1 | 149.9 MW |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA reports August 2001 as GT4's operating month.
| Unknown |
| ST1 | Natural Gas Fired Combined Cycle | Operating | 149.9 | Unknown |
|---|
Monthly generation is reported through EIA-923. Capacity factor uses the current EIA nameplate capacity and is shown only for complete calendar years.
1 ERCOT market resource · Gas turbine
Capacity factor is average output vs. this plant's observed peak.
Observed ERCOT settlement prices at CHE_PUN1 over 365 days (2025-10-26 to 2026-10-25). This plant is also crosswalked to CVC_CVCG1_5, CVC_CVC_G2, CVC_CVC_G3, LHM_CVC_G4, LHM_PUN1, LHM_PUN2; the point with the deepest price history is shown.
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services and any physical dispatch constraint. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
EIA reports June 2002 operating months for GT1, GT2, GT3, and ST1.
Cahill reported the term loan, revolver, and letter-of-credit facilities used to partially finance Elliott's majority acquisition.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Channelview Cogeneration Plant reports 918.3 MW natural gas of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Channelview Cogeneration Plant is a Natural Gas Fired Combined Cycle facility in Harris County, TX, participating in the ERCOT market.
Channelview Cogeneration Plant is in Harris County, TX, inside the ERCOT balancing area.
Channelview Cogeneration Plant is operated by EIF Channelview Cogeneration LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Channelview Cogeneration Plant reported 5,274.2 GWh over the twelve months to 2026-07. Figures are net generation as filed to EIA-923.
By capacity, Channelview Cogeneration Plant ranks #113 of 540 operating plants of the same technology nationally. It ranks #20 of 68 in TX.
Plants within 25 km, nearest first, regardless of technology. Proximity is straight-line distance between mapped plant coordinates; it does not by itself establish a shared point of interconnection.