Ask the Grid
MapMarketsAssetsForecastsDataStoriesPricing
Log inAccountCreate free workspaceOpen workspace
Ask the Grid
Create free workspace
Loading asset profile…
Ask the Grid · Parisi Labs, Inc.
PlatformPricingHelpAboutContactTermsPrivacy
Ask the Grid
MapMarketsAssetsForecastsDataStoriesPricing
Log inAccountCreate free workspaceOpen workspace
Ask the Grid
Create free workspace
  1. Home
  2. /Assets
  3. /Big River Steel Works (BR1 + BR2)

Big River Steel Works (BR1 + BR2)

Large load · 2027 E. STATE HWY. 198, Osceola, AR

Big River Steel Works in Osceola, Arkansas, is U.S. Steel's electric arc furnace flat-rolled campus: the original Big River Steel mill (BR1) and the adjacent Big River 2 (BR2) expansion. With BR2 complete, U.S. Steel says capacity has nearly doubled from three to six million tons a year. The campus is served by Entergy Arkansas, which signed a special rate contract for the original mill in 2015 and said it planned to supply an incremental 550 MW for BR2.

Open in grid
Loading map…
OverviewProfileFacilityPermits and agreementsRelated recordsTimelineSources

Overview

Planned demand
550 MW
operating

Entergy Arkansas calls Big River Steel one of its largest industrial customers. In 2015 the utility agreed a special rate contract with the mill and built $73 million of substation and transmission lines to serve it. At BR2's February 2022 groundbreaking, Entergy said it planned to provide an incremental 550 MW to power the new mill on top of its existing supply to Big River Steel. The 550 MW is the utility's stated plan for the expansion. It is not a metered peak, and the original mill's contracted demand has not been published.

Profile

Original mill: the Flex Mill
Big River Steel announced in March 2017 that its $1.3 billion mill outside Osceola was complete. It describes itself as a "Flex Mill" that combines integrated-mill grade capability with a scrap-based mini mill. U.S. Steel, which later took full ownership, opened a $450 million electrical steel line on the site in 2023.
Big River 2
BR2 was designed with two electric arc furnaces and 3 million tons a year of steelmaking capacity, along with North America's only endless strip production (ESP) casting and rolling line. U.S. Steel said in December 2025 that the expansion was complete, and by March 2026 it described BR2 as complete and online. Entergy's 250 MW Driver Solar farm, approved in 2022, sits next to the campus and was presented as helping U.S. Steel meet its sustainability goals.
Next: a direct reduced iron plant
In November 2025 U.S. Steel announced a direct reduced iron (DRI) plant on the Big River Steel Works campus. It will make feedstock for the electric arc furnaces from Minnesota ore pellets. Cost, staffing and power requirements have not been announced.

Facility

Activity
Electric arc furnace flat-rolled steel: hot-rolled, cold-rolled, coated and electrical steel coil (about 6 million tons a year across BR1 and BR2)
Industry
Manufacturing
Site type
Facility
Operating status
Operating

Permits and agreements

Agreement
2015 special rate contract with Entergy Arkansas, with $73 million of substation and transmission built to serve the mill

Related records

OrganizationRoleBasisOpen
United States Steel CorporationOwnerThe Next Generation of American Steelmaking is BIG and Well Underway - www.ussteel.com

Timeline

Mar 1, 2017
Big River Steel announces its $1.3 billion mill is complete

Big River Steel begins full-time production - Talk Business & Politics

Feb 10, 2022
BR2 groundbreaking; Entergy plans incremental 550 MW

Entergy joins U. S. Steel in celebrating construction of their newest mill - Entergy

Oct 4, 2022
Arkansas PSC approves Entergy's 250 MW Driver Solar next to the campus

Entergy Arkansas receives approval for 250-megawatt solar farm near Osceola - Talk Business & Politics

Nov 12, 2025
U.S. Steel announces a DRI plant on the campus

New steel mill slated for Big River Steel Works campus - Talk Business & Politics

Dec 15, 2025
U.S. Steel marks completion of BR2

The Next Generation of American Steelmaking is BIG and Well Underway - www.ussteel.com

Sources

PublisherReferenceTypeOpen
ussteel.comReady to Roll: The Arrival of Big River 2 Will Change How You Source Steel - www.ussteel.comSourceussteel.comMedia - Next Generation Steel Mill - www.ussteel.comSourceentergy.comEntergy joins U. S. Steel in celebrating construction of their newest mill - EntergySourcetalkbusiness.netBig River Steel begins full-time production - Talk Business & PoliticsSourcetalkbusiness.netNew steel line opens at Big River facility in Osceola - Talk Business & PoliticsSourceussteel.comThe Next Generation of American Steelmaking is BIG and Well Underway - www.ussteel.comSourcetalkbusiness.netEntergy Arkansas receives approval for 250-megawatt solar farm near Osceola - Talk Business & PoliticsSourcetalkbusiness.netNew steel mill slated for Big River Steel Works campus - Talk Business & PoliticsSourcefrs-public.epa.govfrs-public.epa.govSource
Ask the Grid · Parisi Labs, Inc.
PlatformPricingHelpAboutContactTermsPrivacy
MapMarketsAssetsForecastsDataStoriesPricing
Dashboard
Your work
ProjectsEarly access
Saved
Alerts
Reports
Markets
North America
ERCOT logoERCOT
NYISO logoNYISO
CAISO logoCAISO
All markets
Reference
Wire
Stories
Views
Data
Preferences
Create free workspace
Developers
Help
History
Settings
Invites
Website · About · Legal · Privacy · Changelog · © 2026 Parisi Labs
MapMarketsAssetsForecastsDataStoriesPricing
Dashboard
Your work
ProjectsEarly access
Saved
Alerts
Reports
Markets
North America
ERCOT logoERCOT
NYISO logoNYISO
CAISO logoCAISO
All markets
Reference
Wire
Stories
Views
Data
Preferences
Create free workspace
Developers
Help
History
Settings
Invites
Website · About · Legal · Privacy · Changelog · © 2026 Parisi Labs