Bitdeer Tennessee
Operating
Bitdeer Tennessee is a bitcoin mining facility at 5101 S. National Dr. in Knoxville that Bitdeer bought from Panasonic and upgraded. Bitdeer lists 86 MW of online electrical capacity at the site and is converting it to AI cloud, with completion targeted for Q3 2027 after a redesign for larger deployments. A proposed Knox County data center moratorium lists it as an existing operation and would bar it from raising its contracted peak power.
Loading map…
Overview
- Exact-site power
- 86 MW
- Capacity basis unspecified · Reported
- Status
- Operating
- Operating facility
- Compute profile
- Crypto Mining · AI HPC
- Project scope
- Conversion from crypto mining to AI cloud, redesigned for larger deployments; overall completion targeted for Q3 2027.
- Power and grid
- Listed under online electrical capacity in Bitdeer's Q2 2026 results; the site is being converted from crypto mining to AI cloud, with overall completion targeted for Q3 2027; basis unspecified.
Power and grid
- Utility
- Knoxville Utilities Board
- Nearest substations
- Unnamed tap161 kV
- Unnamed tap161 kV
- Point of interconnection
- Not identified
- Interconnection request
Facility and development
- Facility class
- Crypto Mining · AI HPC
- Operating context
- Bitcoin mining facility bought from Panasonic and upgraded, established 2020 with 60% carbon-free energy; being converted to AI cloud.
- Transactions
- Facility purchased from Panasonic
- Regulatory record
- A proposed Knox County data center moratorium (amended language posted June 17, 2026) names Bitdeer Tennessee as an existing operation and would bar listed operations from expanding by raising their contracted peak power with the local utility.