Blythe Mesa Solar II
Intersect Power, LLC · Riverside County · CAISO
Blythe Mesa Solar II is a hybrid solar and battery storage facility with 335.6 MW of EIA-reported total operating capacity and 448 MWh of reported storage energy capacity in Riverside County, California, registered as EIA Plant ID 65053. Intersect Power, LLC is the current owner. The EIA-based plant record ranks Blythe Mesa Solar II #101 in the United States and #20 in California by capacity.