Borden County BESS is a battery energy storage facility with 150 MW of EIA-reported operating capacity and 300 MWh of reported energy capacity in Borden County, Texas, registered as EIA Plant ID 66804. Borden County Battery Energy Storage System LLC is the registered plant entity or operator. Its grid role is energy storage resource (merchant battery) — participates in ERCOT day‑ahead and ancillary services markets for energy arbitrage and ancillary services.
Mapped infrastructure geometry associated with this asset.
Batteries
2-hour storage duration
ERCOT
ERCOT · Borden County
EIA plant 66804 · Inventory for Sep 2026.
| Generator | Technology | Status | Power (MW) | Energy (MWh) |
|---|---|---|---|---|
| 1 | Batteries | Operating | 150 | 300 |
Similar plants ranked by technology, capacity, and distance.
Current generator records and technology attributes reported through EIA-860.
| Generator | Capacity | Technology | Operation | Status |
|---|---|---|---|---|
| 1 | 150 MW 150 MW summer | Batteries BA | Aug 2024 | Operating |
Monthly EIA generation history and recent market-resource behavior where linked telemetry is available.
Deterministic links to ERCOT market resources, price records, outage disclosures, queue records, and nearby infrastructure. Candidate joins remain labeled until corroborated.
Source-backed project transactions, agreements, land records, permits, and environmental disclosures. Portfolio and adjacent-project facts remain explicitly scoped.
Parties, market resources, and identifiers tied to this asset, with owner, operator, developer, EPC, compliance provider, and interconnecting entity roles kept separate.
Drag organizations to explore the network. Select a node to pin its details and available page link.
Project milestones and public references behind the asset profile.
EIA-860 lists generator 1 with this operating date.
ERCOT SCED disclosure is delayed, so plant performance windows end at the latest disclosed interval.
Aypa Power’s corporate site and press release state that Aypa Power 'develops, owns, and operates' utility-scale storage projects and that the November 8, 2023 portfolio financing 'supports... the Borden County project (a 150MW / 300MWh battery storage project in Texas)'. These statements identify Aypa Power as the project's developer/portfolio owner, while separate registry filings show the legal operator entity as the project-specific LLC.
EIA-923 reports gross generation and net grid exchange for storage plants. Gross generation is shown as a discharge proxy; it is not a cycle count or conventional capacity factor.
1 ERCOT market resource · Battery / storage
Cycles/day is discharged energy vs. usable capacity (~370 MWh). Capacity factor is avg discharge vs. peak.
Observed ERCOT settlement prices at BOCO_ESS_RN over 365 days (2025-10-26 to 2026-10-25).
The TB2 figure is a price benchmark, not revenue: it values one perfect-foresight cycle per day between the 2 cheapest and 2 dearest hours of each day, gross of round-trip losses, and excludes ancillary services. It describes what this node’s price shape was worth over the window — it is not this asset’s realized capture, and no dispatch is assumed or modelled.
Portfolio membership follows the latest EIA-860 reporting entity. It does not imply ultimate ownership.
Answered from the published record above. Questions whose inputs this profile does not carry are omitted rather than estimated.
Borden County BESS reports 150 MW battery storage of operating nameplate capacity. These technology ratings do not establish a common export limit. Source: EIA Sep 2026.
Borden County BESS is a batteries facility in Borden County, TX, participating in the ERCOT market.
Borden County BESS is in Borden County, TX, inside the ERCOT balancing area.
Borden County BESS is operated by Borden County Battery Energy Storage System LLC according to the EIA generator inventory. Reporting membership does not by itself establish ultimate ownership.
Borden County BESS reported 131 GWh over the twelve months to 2026-07. For a storage plant this is reported gross generation — a discharge proxy, not a cycle count or a conventional capacity factor.
Borden County BESS interconnects at BOCO_ESS.
By capacity, Borden County BESS ranks #102 of 1,061 operating plants of the same technology nationally. It ranks #41 of 254 in TX.